TEXAS · WELLS · NOLAN COUNTY · CALDWELL LEASE · API 42-353-32419 · DISTRICT 6E
Caldwell #1
Nolan County · Dora North (Ellenburger) field · Vertical
Caldwell #1 (API 42-353-32419) is a plugged well in Nolan County, plugged May 20, 1999, last operated by Fortune Production CO..
The RRC has issued one drilling permit (amended once), issued April 18, 1996, permitted to 6,900 ft.
Completion filings report 4 formation tops, including Cisco, Odom, Caddo, Ellenburger.
Its lease has reported 2.46K barrels of oil and 437 mcf of gas since July 1996, with no volume in the three years through April 2026.
Operator of record
- Based in
- San Angelo, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 1, 2008
- Permits on file
- 153
- Phone
- (325) 651-2948
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fortune Production Co. |
| Production reports | Fortune Production Co.through Feb 1999 |
| Latest permit | Fortune Production Co.Apr 18, 1996 |
- 6,900
- total depth, ft
- 2
- permits on file
- Apr 18, 1996
- last permit issued
- Jun 28, 1996
- completed
- 2.46K
- cumulative oil, bbl
- 437
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Feb 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 28, 1996
- Shut in
- —
- Plugged
- May 20, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Caldwell O-8-27915 | Dora, North (Ellenburger) | Fortune Production Co. | 1 | 2.46K | 437 | Jul 1996 – Feb 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fortune Production Co.Jul 1996 → Feb 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 446985-98 | Drill | Fortune Production Co. | Aug 19, 1996 | Apr 18, 1996 | May 10, 1996 | 6,445 |
| 446985-99 | Drill | Fortune Production Co. | Apr 15, 1996 | Apr 18, 1996 | — | 6,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 28, 1996 | Caldwell O-8-27915 | Dora North (Ellenburger) | Fortune Production Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,466 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cisco | 3,668 | -1,202 |
| Odom | 6,083 | -3,617 |
| Caddo | 6,278 | -3,812 |
| Ellenburger | 6,354 | -3,888 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,389 | 6,393 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 371 | 12.25 | 225 S |
| 4.5 | 6,445 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 7, 1996 | Sep 4, 1996 | Yes |
| 00 | Sep 3, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-32419 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-32419 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35332419, documented in the API reference.