TEXAS · WELLS · NOLAN COUNTY · API 42-353-32607 · DISTRICT 7B

North Nena Lucia Unit #201

N

Nolan County  · Vertical

North Nena Lucia Unit #201 (API 42-353-32607) is a former disposal or injection well in Nolan County, last operated by Oryx Energy Company; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued January 23, 1998, permitted to 7,500 ft.

Operator of record

Oryx Energy Company

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 27, 1998
Permits on file
1,627
Phone
(972) 715-4000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitOryx Energy CompanyJan 23, 1998
7,500
total depth, ft
1
permits on file
Jan 23, 1998
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
472424-99DrillOryx Energy CompanyJan 20, 1998Jan 23, 1998—7,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 1999
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000087728H-1 InjectionCanceled Jan 4, 20011,5003,0006,700–7,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119981999

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35332607, documented in the API reference.