WELL · 42-353-32691 · DISTRICT 7
Boyd, C. E. 44 #4044T
Nolan County · Vertical
Boyd, C. E. 44 #4044T (API 42-353-32691) is a permitted well in Nolan County filed by Clear Fork, Incorporated; no completion report is on file yet.
The RRC has issued 3 drilling permits (amended once) between 2000 and 2004, permitted to 6,706 ft.
Completion filings report 3 formation tops, including B/Coleman Junction, B/Cisco Lime, Palo Pinto.
Its 3 leases have reported 1.53M barrels of oil and 929K mcf of gas since January 1993, last reporting in July 2026. The leases carry 43 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Abilene, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 4, 2026
- Permits on file
- 472
- Phone
- (325) 677-1309
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Clear Fork, Incorporatedthrough Apr 2026 |
| Latest permit | Clear Fork, IncorporatedJun 17, 2004 |
- 6,706
- total depth, ft
- 4
- permits on file
- Jun 17, 2004
- last permit issued
- —
- completed
- 1.53M
- cumulative oil, bbl
- 929K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 43 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Boyd,c.e., Etal Palo Pinto Unit O-8-10135 | Evb (Palo Pinto) | Clear Fork, Incorporated | 24 | 792K | 589K | Jan 1993 – Jul 2026 |
| Evb (Canyon Sand) Unit O-8-30532 | Evb (4800 Canyon Sand) | Clear Fork, Incorporated | 17 | 601K | 148K | May 2010 – Jul 2026 |
| Boyd, C. E. 44 O-8-29430 | Evb (4800 Canyon Sand) | Clear Fork, Incorporated | 2 | 141K | 191K | Jul 2004 – Jul 2010 |
Oil, barrels lease total
Last 12 months 5,452 · prior 12 9,282(-41%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Clear Fork, IncorporatedJan 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 546802-99 | Recompletion | Clear Fork, Incorporated | Jun 10, 2004 | Jun 17, 2004 | Jul 2, 2004 | 6,706 |
| 518184-99 | Recompletion | Clear Fork, Incorporated | Feb 22, 2002 | Feb 27, 2002 | — | 6,706 |
| 496806-98 | Drill | Clear Fork, Incorporated | Sep 5, 2000 | Jul 19, 2000 | Aug 23, 2000 | 6,700 |
| 496806-99 | Drill | Clear Fork, Incorporated | Jul 3, 2000 | Jul 19, 2000 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-10135 | — | — | — | — |
| — | — O-8-29430 | — | — | — | — |
| — | — O-8-30532 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,479 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Coleman Junction | 3,299 | -820 |
| B/Cisco Lime | 4,444 | -1,965 |
| Palo PintoPALO PINTO REEF | 5,619 | -3,140 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,846 | 4,851 | Perforated |
| 4,857 | 4,860 | Perforated |
| 4,884 | 4,888 | Perforated |
| 4,891 | 4,895 | Perforated |
| 5,627 | 5,630 | Perforated |
| 5,634 | 5,656 | Perforated |
| 5,673 | 5,687 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 544 | 12.25 | 250 S |
| 5.5 | 6,706 | 7.875 | 425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 9, 2010 | Jul 22, 2004 | Yes |
| 00 | Sep 29, 2004 | Jul 22, 2004 | Yes |
| 00 | Aug 12, 2004 | — | — |
| 00 | Nov 11, 2000 | Oct 7, 2000 | Yes |
| 00 | Oct 20, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-32691 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-32691 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35332691, documented in the API reference.