WELL · 42-353-33150 · DISTRICT 7
Staton Price Unit #1
Nolan County · Sweetwater (Canyon Sand) field · Injection · Directional
Staton Price Unit #1 (API 42-353-33150) is a well in Nolan County operated by Extex Operating Company, completed June 24, 2020 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued July 22, 2010, permitted to 5,999 ft.
It was permitted by Cholla Petroleum, Inc. and has since transferred to Extex Operating Company on the wellbore schedule.
Completion filings report 5 formation tops, including Flippen, Breckenridge, Sterratt, Cisco.
Its lease has reported 15.2K barrels of oil since March 2011, last reporting in July 2026.
It holds an active disposal or injection permit, with 67.9K barrels injected in the 12 months reported through November 2025.
Operator of record
Permitted by Cholla Petroleum, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Nov 4, 2025 · 117 permits on file · (713) 870-4327
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Extex Operating Company |
| Production reports | Cholla Petroleum, Inc.through Dec 2019 |
| Latest permit | Cholla Petroleum, Inc.Jul 22, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,999
- total depth, ft
- 1
- permits on file
- Jul 22, 2010
- last permit issued
- Jun 24, 2020
- completed
- 15.2K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 24, 2020
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Staton Price Unit O-8-30775 | Sweetwater (Canyon Sand) | Extex Operating Company | 1 | 15.2K | 0 | Mar 2011 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cholla Petroleum, Inc.Mar 2011 → Dec 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 698059-99 | Drill | Cholla Petroleum, Inc. | Jun 23, 2010 | Jul 22, 2010 | Feb 16, 2011 | 5,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-30775 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,151 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,638 | 5,644 | Perforated |
| 5,650 | 5,657 | Perforated |
| 5,660 | 5,661 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 210 | 12.25 | 135 S |
| 4.5 | 5,732 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 10, 2020 | Jul 14, 2020 | — |
| 00 | Oct 27, 2011 | Apr 5, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-33150 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-33150 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 67.9K
- bbl, last 12 reported months
- 302K
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000121737 | H-1 Injection | Active | 4,000 | 2,734 | 5,468–5,570 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 67,947 · prior 12 60,224(+13%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35333150, documented in the API reference.