WELL · 42-353-33250 · DISTRICT 7
Sanderson #9
Nolan County · Lazarus (Strawn) field · Producing · Vertical
Sanderson #9 (API 42-353-33250) is a well in Nolan County operated by Clear Fork Incorporated, completed May 1, 2014 and listed as producing on the RRC schedule.
The RRC has issued 3 drilling permits between 2011 and 2012, permitted to 6,800 ft.
Completion filings report 11 formation tops, including Elm Creek - Disposal, Cisco, Coleman Junction, Strawn.
Its 2 leases have reported 76.6K barrels of oil and 444K mcf of gas since December 2011, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Abilene, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 4, 2026
- Permits on file
- 472
- Phone
- (325) 677-1309
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Clear Fork Incorporated |
| Production reports | Clear Fork, Incorporatedthrough Apr 2026 |
| Latest permit | Clear Fork, IncorporatedOct 22, 2012 |
- 6,800
- total depth, ft
- 3
- permits on file
- Oct 22, 2012
- last permit issued
- May 1, 2014
- completed
- 76.6K
- cumulative oil, bbl
- 444K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 1, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sanderson G-8-262704 | Lazarus (G-2) | Clear Fork, Incorporated | 1 | 0 | 135K | Dec 2011 – Jul 2026 |
| Sanderson O-8-31517 | Lazarus (Strawn) | Clear Fork, Incorporated | 1 | 76.6K | 309K | May 2014 – Jul 2026 |
Oil, barrels lease total
Last 12 months 3,934 · prior 12 4,523(-13%)
Gas, mcf lease total
Last 12 months 9,401 · prior 12 11,881(-21%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Clear Fork, IncorporatedDec 2011 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 750021-99 | Recompletion | Clear Fork, Incorporated | Oct 17, 2012 | Oct 22, 2012 | Dec 13, 2011 | 6,700 |
| 744849-99 | Field transfer | Clear Fork, Incorporated | Jul 17, 2012 | Jul 26, 2012 | Nov 22, 2011 | 6,700 |
| 725158-99 | Drill | Clear Fork, Incorporated | Sep 28, 2011 | Sep 29, 2011 | Nov 22, 2011 | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-262704 | — | — | — | — |
| — | — O-8-31517 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,181 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Elm Creek - Disposal | 2,850 | -669 |
| CiscoCISCO LIME - DISPOSAL | 3,110 | -929 |
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO | 3,180 | -999 |
| Strawn | 6,100 | -3,919 |
| Breckenridge - Disposal | — | — |
| Cambrian - Disposal | — | — |
| EllenburgerELLENBURGER - DISPOSAL | — | — |
| Flippen Lime - Disposal | — | — |
| Flippen Sand - Disposal | — | — |
| King Sand - Disposal | — | — |
| TannehillTANNEHILL - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,002 | 6,010 | Perforated |
| 6,012 | 6,017 | Perforated |
| 6,065 | 6,068 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 215 | 12.25 | 150 S |
| 5.5 | 4,210 | 7.875 | 325 S |
| 5.5 | 6,241 | 7.875 | 240 S |
| 5.5 | — | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 7, 2014 | May 7, 2014 | Yes |
| 00 | Oct 16, 2012 | Jul 30, 2012 | Yes |
| 00 | Mar 21, 2012 | Jan 25, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-33250 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-33250 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35333250, documented in the API reference.