TEXAS · WELLS · NOLAN COUNTY · API 42-353-33331 · DISTRICT 7B

Oxo #2W

Plugged

Nolan County  · Vertical

Oxo #2W (API 42-353-33331) is a plugged well in Nolan County, plugged August 13, 2012, last operated by Clear Fork, Incorporated.

The RRC has issued 2 drilling permits between 2012 and 2013, permitted to 6,700 ft.

Operator of record

Clear Fork, Incorporated

Based in
Abilene, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
472
Phone
(325) 677-1309

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitClear Fork, IncorporatedDec 31, 2013
6,700
total depth, ft
2
permits on file
Dec 31, 2013
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Aug 13, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
775565-99ReenterClear Fork, IncorporatedDec 12, 2013Dec 31, 2013—6,700
740584-99DrillClear Fork, IncorporatedMay 14, 2012May 22, 2012Jul 30, 20126,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108838H-1 InjectionCanceled Feb 6, 20172,5002,5006,380–6,660

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35333331, documented in the API reference.