WELL · 42-355-00107 · DISTRICT 4
King Richard C #39
Nueces County · Richard King (4000) field · Vertical
King Richard C #39 (API 42-355-00107) is a plugged well in Nueces County, plugged September 10, 1998, last operated by Synergy Oil & Gas Inc. (A).
The RRC has issued one drilling permit, issued September 12, 1997, permitted to 5,402 ft.
Its 2 leases have reported 12.1K barrels of oil and 31.8K mcf of gas since January 1993, last reporting in January 2010. The leases carry 19 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 4, 2001
- Permits on file
- 84
- Phone
- (713) 461-6626
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Synergy Oil & Gas Inc. (A) |
| Production reports | Synergy Production Companythrough Dec 1995 |
| Latest permit | Synergy Oil & Gas, Inc. (A)Sep 12, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,402
- total depth, ft
- 1
- permits on file
- Sep 12, 1997
- last permit issued
- Oct 14, 1997
- completed
- 12.1K
- cumulative oil, bbl
- 31.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 14, 1997
- Shut in
- —
- Plugged
- Sep 10, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 19 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Estell, Mary King O-4-2327 | Richard King | Durango Resources Corp. | 18 | 12.1K | 31.8K | Jan 1993 – Jan 2010 |
| King, Richard "C" G-4-167008 | Richard King (4000) | Synergy Oil & Gas, Inc. (A) | 1 | 0 | 0 | Oct 1997 – Sep 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kamlok Oil & Gas, Inc.Jan 1993 → Aug 1995
- 2Synergy Production CompanySep 1995 → Dec 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 467529-99 | Recompletion | Synergy Oil & Gas, Inc. (A) | Sep 12, 1997 | Sep 12, 1997 | Oct 9, 1997 | 5,402 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-167008 | — | — | — | — |
| — | — O-4-2327 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,988 | 3,998 | Perforated |
| 4,178 | 4,192 | Perforated |
| — | 5,396 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 915 | 15 | 600 S |
| 5.5 | 5,402 | 9.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 28, 1998 | Jan 21, 1998 | — |
| 00 | Mar 13, 1998 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-00107 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-00107 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35500107, documented in the API reference.