TEXAS · WELLS · NUECES COUNTY · WARDNER, G. P. LEASE · API 42-355-05314 · DISTRICT 04

Wardner G. P. #72

Plugged

Nueces County · Stratton (Consolidated) field  · Vertical

Wardner G. P. #72 (API 42-355-05314) is a plugged well in Nueces County, plugged September 13, 2010, last operated by Apache Corporation.

The RRC has issued one drilling permit, issued March 23, 1978, permitted to 6,438 ft.

It was permitted by Champlin Petroleum CO. and has since transferred to Apache Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including 5000' Sand, 5300' B Sand, 5800' Sand.

Its lease has reported 307K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Apache Corporation

Permitted by Champlin Petroleum Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,758
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough Aug 2002
Latest permitChamplin Petroleum Co.Mar 23, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,438
total depth, ft
1
permits on file
Mar 23, 1978
last permit issued
Jun 10, 1978
completed
0
cumulative oil, bbl
307K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 10, 1978
Shut in
—
Plugged
Sep 13, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wardner, G. P. G-4-77049Stratton (Consolidated)Apache Corporation10307KJan 1993 – Aug 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Jan 1999
  2. 2Collins & Ware, Inc.Feb 1999 → Jun 2000
  3. 3Apache CorporationJul 2000 → Aug 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
20698-99RecompletionChamplin Petroleum Co.Mar 23, 1978Mar 23, 1978—6,438

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 10, 1978Wardner G. P. G-4-77049Stratton (Consolidated)Apache CorporationPlugged—
—— G-4-968748——Plugged—
—Wardner G. P. G-4-13640Stratton (Wardner)Champlin Petroleum Co.Plugged—
—Wardner G. P. G-4-45873Stratton (Bertram)Champlin Petroleum Co.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 106 ft elevation.Download CSV →

FormationMD ftSubsea
5000' Sand4,967-4,861
5300' B Sand5,322-5,216
5800' Sand5,832-5,726

Perforations

Perforated and open-hole intervals.

FromToType
6,0866,094Perforated
6,1006,118Perforated
6,2276,245Perforated
6,4076,424Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,525151,000 S
10.751,526151,000 S
76,4559.8751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 21, 1988Feb 5, 1988—
00Jan 12, 1984Jun 20, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35505314, documented in the API reference.