TEXAS · WELLS · NUECES COUNTY · API 42-355-30173 · DISTRICT 04

Luby J. P. #66

Shut in

Nueces County · Luby (9950) field · Producing  · Vertical

Luby J. P. #66 (API 42-355-30173) is a well in Nueces County operated by Alegre Operating Inc., completed September 4, 1998 and listed as producing on the RRC schedule, shut in June 1, 2026.

The RRC has issued 2 drilling permits between 1984 and 1998, permitted to 10,793 ft.

It was permitted by Apache Corporation and has since transferred to Alegre Operating Inc. on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Alegre Operating Inc.

Permitted by Apache Corporation; the EWA schedule now lists a different operator.

Based in
Corpus Chrsti, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Phone
(361) 882-2050

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsAlegre Operating, Inc.through Apr 2026
Latest permitApache CorporationSep 23, 1998
10,793
total depth, ft
2
permits on file
Sep 23, 1998
last permit issued
Sep 4, 1998
completed
0
cumulative oil, bbl
2.65M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 4, 1998
Shut in
Jun 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Luby, J. P. G-4-170314Luby (9950)Alegre Operating, Inc.101.91MSep 1998 – Jul 2026
Luby, J. P. G-4-59559Luby ( 9000)Apache Corporation10742KJan 1993 – Sep 1998

Gas, mcf lease total

Last 12 months 16,558 · prior 12 15,954(+4%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Feb 1995
  2. 2Apache CorporationMar 1995 → Jun 2003
  3. 3Pearl, Bill H. Productions, Inc.Jul 2003 → Jun 2025
  4. 4Alegre Operating, Inc.Jul 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
479571-99RecompletionApache CorporationSep 18, 1998Sep 23, 1998Sep 3, 19989,996
243072-99RecompletionTexaco Inc.Jun 22, 1984Jun 25, 1984—10,793

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 4, 1998Luby J. P. G-4-170314Luby (9950)Alegre Operating Inc.Producing · shut in Jun 1, 202610,793
Aug 6, 1984Luby J. P. G-4-59559Luby ( 9000)Apache CorporationNot on Schedule—
May 1, 1972— G-4-53192Luby ( 8600)Texaco Inc.Not on Schedule—
Jun 1, 1971— G-4-50546Luby (10200)Texaco Inc.Not on Schedule—
Jun 1, 1971— G-4-50547Luby ( 9000)Texaco Inc.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
8,6328,646Perforated
9,0079,013Perforated
9,0209,035Perforated
9,9739,978Perforated
9,9849,996Perforated
10,56810,598Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,08617.51,450 S
13.3752,086——
9.6258,86712.25400 S
9.6258,867—400 sx
710,7938.5350 S
710,793—350 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 19, 1998Oct 1, 1998Yes
00Oct 15, 1998——
00Sep 17, 1984Aug 22, 1984—
00Jan 12, 1984Aug 22, 1984—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35530173, documented in the API reference.