WELL · 42-355-30626 · DISTRICT 4
Baldwin, J. C. #32
Nueces County · Vertical
Baldwin, J. C. #32 (API 42-355-30626) is a former disposal or injection well in Nueces County, last operated by Mobil Producing TX. & N.M. Inc.; its UIC permit is no longer active.
The RRC has issued 3 drilling permits between 1978 and 1984, permitted to 7,087 ft.
Operator of record
Mobil Producing TX. & N.M. Inc.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2025
- Permits on file
- 6,763
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Mobil Producing TX. & N.M. Inc.Jun 28, 1984 |
- 7,087
- total depth, ft
- 3
- permits on file
- Jun 28, 1984
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baldwin, J. C. G-4-102749 | Baldwin (2830 Lagarto) | Musselman, Owen & King Oper.,inc | 1 | 0 | 0 | Jan 1993 – Jan 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 243399-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jun 25, 1984 | Jun 28, 1984 | — | 7,087 |
| 157617-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Apr 21, 1982 | Apr 21, 1982 | — | 2,768 |
| 21523-99 | Recompletion | Mobil Oil Corporation | Apr 6, 1978 | Apr 6, 1978 | — | 7,087 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-102749 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,118 | 2,137 | Perforated |
| 2,736 | 2,741 | Perforated |
| 2,871 | 2,880 | Perforated |
| — | 4,061 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 528 | 12.25 | 250 S |
| 8.625 | 528 | — | — |
| 8.625 | 532 | — | — |
| 2.375 | 2,687 | — | — |
| 2.375 | 2,830 | — | — |
| 5.5 | 4,215 | 7.875 | 350 S |
| 5.5 | 4,215 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 10, 1991 | May 7, 1991 | — |
| 00 | Sep 28, 1984 | Aug 18, 1984 | — |
| 00 | Jan 12, 1984 | Aug 18, 1984 | — |
| 00 | Jan 12, 1984 | Mar 12, 1979 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-30626 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-30626 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 434K
- bbl, all reported
- Feb 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000054309 | W-14 Disposal | Plugged Feb 24, 1995 | 1,200 | 1,000 | 1,550–2,300 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35530626, documented in the API reference.