TEXAS · WELLS · NUECES COUNTY · API 42-355-30856 · DISTRICT 04

King Ranch Chiltipin #52

Plugged

Nueces County · Arnold--David (10 400) field  · Vertical

King Ranch Chiltipin #52 (API 42-355-30856) is a plugged well in Nueces County, plugged June 29, 1987, last operated by Exxon Corp..

The RRC has issued one drilling permit, issued June 19, 1978, permitted to 11,000 ft.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsnone
Latest permitExxon Corp.Jun 19, 1978
11,000
total depth, ft
1
permits on file
Jun 19, 1978
last permit issued
Sep 14, 1978
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 14, 1978
Shut in
—
Plugged
Jun 29, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
26788-99DrillExxon Corp.Jun 19, 1978Jun 19, 1978—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 14, 1978King Ranch Chiltipin G-4-79150Arnold--David (10 400)Exxon Corp.Plugged—

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,05014.751,195 S
7.6259,1909.875940 S
2.87510,5814.12575 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Nov 8, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35530856, documented in the API reference.