TEXAS · WELLS · NUECES COUNTY · API 42-355-31321 · DISTRICT 04
King Ranch East Laureles #G 41F
Nueces County · Laguna Larga (B-1 IV) field · Vertical
King Ranch East Laureles #G 41F (API 42-355-31321) is a plugged well in Nueces County, plugged May 15, 2009, last operated by Exxon Mobil Corporation.
The RRC has issued 13 drilling permits (amended 3 times) between 1978 and 2001, permitted to 9,400 ft.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 15, 2026
- Permits on file
- 1,223
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Mobil Corporation |
| Production reports | Exxon Corp.through Feb 1999 |
| Latest permit | Exxon Mobil CorporationApr 10, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,400
- total depth, ft
- 16
- permits on file
- Apr 10, 2001
- last permit issued
- Sep 20, 2002
- completed
- 0
- cumulative oil, bbl
- 2.98M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 20, 2002
- Shut in
- —
- Plugged
- May 15, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch East Laureles G-4-133185 | Laguna Larga (B-1 IV) | Exxon Mobil Corporation | 1 | 0 | 2.77M | Jan 1993 – May 2009 |
| King Ranch East Laureles G-4-148652 | Laguna Larga (K-1) | Exxon Mobil Corporation | 1 | 0 | 200K | Jan 1994 – Sep 2002 |
| King Ranch East Laureles G-4-147297 | Wildcat | Exxon Corp. | 1 | 0 | 7.7K | Oct 1993 – Jan 1994 |
| King Ranch East Laureles G-4-124672 | Laguna Larga (K-3) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – Oct 1993 |
| — G-4-130634 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Feb 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 507652-98 | Recompletion | Exxon Mobil Corporation | Jul 12, 2002 | Apr 10, 2001 | Apr 24, 2001 | 7,380 |
| 507652-99 | Recompletion | Exxon Mobil Corporation | Apr 10, 2001 | Apr 10, 2001 | — | 7,380 |
| 419222-99 | Recompletion | Exxon Corp. | Dec 10, 1993 | Dec 10, 1993 | Jan 7, 1993 | 7,386 |
| 416347-99 | Recompletion | Exxon Corp. | Sep 23, 1993 | Sep 23, 1993 | Oct 19, 1993 | 7,463 |
| 361337-99 | Recompletion | Exxon Corp. | Jul 10, 1989 | Jul 12, 1989 | — | 9,000 |
| 343955-97 | Recompletion | Exxon Corp. | May 1, 1989 | Mar 17, 1988 | — | 9,400 |
| 343955-98 | Recompletion | Exxon Corp. | May 17, 1988 | Mar 17, 1988 | — | 9,400 |
| 343955-99 | Recompletion | Exxon Corp. | Mar 16, 1988 | Mar 17, 1988 | — | 9,000 |
| 330823-99 | Recompletion | Exxon Corp. | May 28, 1987 | Jun 4, 1987 | — | 9,000 |
| 276051-99 | Recompletion | Exxon Corp. | May 23, 1985 | May 24, 1985 | — | 9,000 |
| 263657-99 | Recompletion | Exxon Corp. | Jan 7, 1985 | Jan 7, 1985 | — | 9,000 |
| 246844-99 | Recompletion | Exxon Corp. | Jul 30, 1984 | Jul 31, 1984 | — | 9,000 |
| 229782-99 | Recompletion | Exxon Corp. | Feb 16, 1984 | Feb 17, 1984 | — | 9,000 |
| 180290-99 | Recompletion | Exxon Corp. | Dec 16, 1982 | Dec 16, 1982 | — | 9,400 |
| 98389-99 | Other | Exxon Corp. | Nov 7, 1980 | Nov 7, 1980 | Apr 19, 1981 | 9,400 |
| 30518-99 | Drill | Exxon Corp. | Aug 11, 1978 | Aug 11, 1978 | Aug 18, 1978 | 9,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 20, 2002 | King Ranch East Laureles G-4-133185 | Laguna Larga (B-1 IV) | Exxon Mobil Corporation | Plugged | — |
| Sep 20, 2002 | King Ranch East Laureles G-4-133185 | Laguna Larga (B-1 IV) | Exxon Mobil Corporation | Plugged | — |
| Jan 7, 1994 | King Ranch East Laureles G-4-148652 | Laguna Larga (K-1) | Exxon Mobil Corporation | Plugged | — |
| Oct 19, 1993 | King Ranch East Laureles G-4-147297 | Wildcat | Exxon Corp. | Plugged | — |
| Apr 11, 1989 | King Ranch East Laureles G-4-130634 | Laguna Larga (L-1) | Exxon Corp. | Plugged | — |
| Jun 23, 1987 | King Ranch East Laureles G-4-124672 | Laguna Larga (K-3) | Exxon Corp. | Plugged | — |
| Jun 20, 1985 | King Ranch East Laureles G-4-117483 | Laguna Larga (L-3) | Exxon Corp. | Plugged | — |
| Jun 18, 1985 | King Ranch East Laureles G-4-117421 | Laguna Larga (L-5) | Exxon Corp. | Plugged | — |
| Feb 11, 1985 | King Ranch East Laureles G-4-106056 | Laguna Larga (M-1) | Exxon Corp. | Plugged | — |
| Feb 11, 1985 | King Ranch East Laureles G-4-106056 | Laguna Larga (M-1) | Exxon Corp. | Plugged | — |
| Oct 3, 1984 | King Ranch East Laureles G-4-113856 | Laguna Larga (M-3) | Exxon Corp. | Plugged | — |
| Apr 5, 1984 | King Ranch East Laureles G-4-110503 | Laguna Larga (O-4) | Exxon Corp. | Plugged | — |
| Oct 24, 1980 | King Ranch East Laureles G-4-91171 | Laguna Larga (M-6) | Exxon Corp. | Plugged | — |
| Sep 13, 1978 | King Ranch East Laureles G-4-88576 | Laguna Larga (P-1) | Exxon Corp. | Plugged | — |
| — | King Ranch East Laureles G-4-91172 | Laguna Larga (0-6) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,278 | 6,286 | Perforated |
| 6,278 | 6,293 | Perforated |
| 7,331 | 7,336 | Perforated |
| 7,408 | 7,413 | Perforated |
| 7,438 | 7,452 | Perforated |
| 7,457 | 7,464 | Perforated |
| 7,816 | 7,826 | Perforated |
| 7,900 | 7,905 | Perforated |
| 7,950 | 7,958 | Perforated |
| 8,056 | 8,062 | Perforated |
| 8,100 | 8,104 | Perforated |
| 8,158 | 8,162 | Perforated |
| 8,288 | 8,296 | Perforated |
| 8,546 | 8,552 | Perforated |
| 8,739 | 8,763 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,546 | 12.25 | 650 S |
| 2.875 | 8,977 | 7.875 | 855 S |
| 2.875 | 8,977 | — | — |
| 2.875 | 8,987 | 7.875 | 855 S |
| 2.875 | 8,987 | — | — |
| 2.875 | 8,988 | 7.875 | 855 sx |
| 8.625 | — | 12.25 | 650 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 26, 2003 | Feb 20, 2003 | — |
| 00 | May 20, 1994 | Feb 24, 1994 | Yes |
| 00 | Apr 7, 1994 | — | — |
| 00 | Jan 18, 1994 | Dec 1, 1993 | Yes |
| 00 | Dec 7, 1993 | — | — |
| 00 | Feb 21, 1990 | Jan 3, 1990 | Yes |
| 00 | Feb 13, 1990 | — | — |
| 00 | Jul 7, 1989 | May 3, 1989 | Yes |
| 00 | Jun 30, 1989 | — | — |
| 00 | Sep 2, 1987 | Jul 22, 1987 | Yes |
| 00 | Aug 17, 1987 | — | — |
| 00 | Sep 6, 1985 | Aug 1, 1985 | — |
| 00 | Aug 10, 1985 | — | — |
| 00 | Aug 7, 1985 | Jul 22, 1985 | Yes |
| 00 | Aug 6, 1985 | — | — |
| 00 | Mar 14, 1985 | Feb 25, 1985 | — |
| 00 | Dec 20, 1984 | Nov 26, 1984 | — |
| 00 | Dec 13, 1984 | Oct 15, 1984 | — |
| 00 | May 31, 1984 | Apr 26, 1984 | — |
| 00 | May 25, 1984 | Apr 26, 1984 | — |
| 00 | Jan 12, 1984 | May 26, 1983 | — |
| 00 | Jan 12, 1984 | Nov 12, 1980 | — |
| 00 | Jan 12, 1984 | Jul 15, 1980 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-31321 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-31321 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35531321, documented in the API reference.