WELL · 42-355-31613 · DISTRICT 4
King Ranch Chiltipin #93
Nueces County · Arnold-David (H-46) field · Vertical
King Ranch Chiltipin #93 (API 42-355-31613) is a plugged well in Nueces County, plugged October 30, 1984, last operated by Exxon Corp..
The RRC has issued 3 drilling permits between 1980 and 1984, permitted to 8,040 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | none |
| Latest permit | Exxon Corp.Feb 21, 1984 |
- 8,040
- total depth, ft
- 3
- permits on file
- Feb 21, 1984
- last permit issued
- Mar 12, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 12, 1984
- Shut in
- —
- Plugged
- Oct 30, 1984
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 229930-99 | Recompletion | Exxon Corp. | Jan 27, 1984 | Feb 21, 1984 | — | 7,640 |
| 142151-99 | Recompletion | Exxon Corp. | Dec 1, 1981 | Dec 1, 1981 | — | 8,040 |
| 86997-99 | Drill | Exxon Corp. | Jul 18, 1980 | Jul 18, 1980 | Jul 27, 1980 | 8,040 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 12, 1984 | King Ranch Chiltipin O-4-9777 | Arnold-David (H-46) | Exxon Corp. | Plugged | — |
| Mar 12, 1984 | King Ranch Chiltipin O-4-9777 | Arnold-David (H-46) | Exxon Corp. | Plugged | — |
| Aug 28, 1980 | King Ranch Chiltipin O-4-9653 | Arnold-David (H-49) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,703 | 5,720 | Perforated |
| 6,427 | 6,432 | Perforated |
| 7,470 | 7,474 | Perforated |
| 7,491 | 7,494 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,544 | 12.25 | 515 sx |
| 9.625 | 1,545 | 12.25 | 515 S |
| 2.875 | 7,616 | 7.875 | 1,215 S |
| 2.875 | 7,616 | 8.75 | 1,215 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 20, 1984 | Jul 30, 1984 | — |
| 00 | May 29, 1984 | Jul 30, 1984 | — |
| 00 | Jan 12, 1984 | Jul 30, 1984 | — |
| 00 | Jan 12, 1984 | Oct 14, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-31613 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-31613 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35531613, documented in the API reference.