WELL · 42-355-31679 · DISTRICT 4

King Ranch Chiltipin #90

Plugged

Nueces County · Arnold-David (H-46) field  · Vertical

King Ranch Chiltipin #90 (API 42-355-31679) is a plugged well in Nueces County, plugged May 21, 1985, last operated by Exxon Corp..

The RRC has issued 2 drilling permits between 1980 and 1984, permitted to 8,080 ft.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsnone
Latest permitExxon Corp.Apr 17, 1984
8,080
total depth, ft
2
permits on file
Apr 17, 1984
last permit issued
Oct 2, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 2, 1984
Shut in
—
Plugged
May 21, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
235889-99RecompletionExxon Corp.Apr 16, 1984Apr 17, 1984—7,680
100173-99DrillExxon Corp.Nov 24, 1980Nov 24, 1980Jan 22, 19818,080

Perforations

Perforated and open-hole intervals.

FromToType
6,0226,031Perforated
7,4957,498Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,51812.25620 S
2.8757,6567.8751,205 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 15, 1984Oct 17, 1984—
00Jan 12, 1984Mar 5, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35531679, documented in the API reference.