WELL · 42-355-31991 · DISTRICT 4
Texon Royalty Co. #7
Nueces County · Stratton (F-39-14) field · Vertical
Texon Royalty CO. #7 (API 42-355-31991) is a plugged well in Nueces County, plugged January 30, 2012, last operated by Champlin Petroleum CO..
The RRC has issued 2 drilling permits between 1982 and 1987, permitted to 8,500 ft.
Completion filings report 3 formation tops, including F-28, F-31-12, F-39-14.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 23, 1986
- Permits on file
- 1,006
- Phone
- (713) 654-2552
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Champlin Petroleum Co. |
| Production reports | Collins & Ware, Inc.through May 2000 |
| Latest permit | Champlin Petroleum Co.Feb 3, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,500
- total depth, ft
- 2
- permits on file
- Feb 3, 1987
- last permit issued
- May 13, 1982
- completed
- 0
- cumulative oil, bbl
- 155K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 13, 1982
- Shut in
- —
- Plugged
- Jan 30, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Texon Royalty Co. G-4-123211 | Stratton (Consolidated) | Apache Corporation | 1 | 0 | 155K | Jan 1993 – Jan 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanyJan 1993 → Jan 1999
- 2Collins & Ware, Inc.Feb 1999 → May 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 326122-99 | Recompletion | Champlin Petroleum Co. | Feb 3, 1987 | Feb 3, 1987 | — | 8,025 |
| 159775-99 | Drill | Champlin Petroleum Co. | Mar 16, 1982 | Mar 16, 1982 | Mar 19, 1982 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-123211 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 127 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| F-28 | 6,607 | -6,480 |
| F-31-12 | 6,758 | -6,631 |
| F-39-14 | 6,908 | -6,781 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,510 | 6,520 | Perforated |
| 6,607 | 6,627 | Perforated |
| 6,758 | 6,768 | Perforated |
| 6,908 | 6,948 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,550 | 14.75 | 815 S |
| 2.375 | 6,238 | — | — |
| 7.625 | 6,650 | 9.875 | 650 S |
| 2.375 | 6,858 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 15, 1991 | Mar 28, 1991 | — |
| 00 | Mar 25, 1987 | Feb 9, 1987 | Yes |
| 00 | Feb 13, 1987 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-31991 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-31991 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35531991, documented in the API reference.