WELL · 42-355-32016 · DISTRICT 4
Gruene O.A. #5
Nueces County · Stratton (F-16-4) field · Vertical
Gruene O.A. #5 (API 42-355-32016) is a plugged well in Nueces County, plugged February 20, 2009, last operated by Champlin Petroleum CO..
The RRC has issued 2 drilling permits between 1982 and 1984, permitted to 8,500 ft.
Completion filings report 6 formation tops, including D-35, D-49, E-31, Bertram.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 23, 1986
- Permits on file
- 1,006
- Phone
- (713) 654-2552
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Champlin Petroleum Co. |
| Production reports | Apache Corporationthrough Mar 2008 |
| Latest permit | Champlin Petroleum Co.Dec 5, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,500
- total depth, ft
- 2
- permits on file
- Dec 5, 1984
- last permit issued
- Aug 19, 1982
- completed
- 0
- cumulative oil, bbl
- 262K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 19, 1982
- Shut in
- —
- Plugged
- Feb 20, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gruene, O.A. G-4-119754 | Stratton (Consolidated) | Apache Corporation | 1 | 0 | 262K | Jan 1993 – Feb 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanyJan 1993 → Jan 1999
- 2Collins & Ware, Inc.Feb 1999 → Jun 2000
- 3Apache CorporationJul 2000 → Mar 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 260608-99 | Recompletion | Champlin Petroleum Co. | Dec 4, 1984 | Dec 5, 1984 | — | 8,303 |
| 161345-99 | Drill | Champlin Petroleum Co. | May 20, 1982 | May 20, 1982 | May 17, 1982 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-119754 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 108 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| D-35 | 5,710 | -5,602 |
| D-49 | 5,832 | -5,724 |
| E-31 | 6,150 | -6,042 |
| Bertram | 6,288 | -6,180 |
| F-16 | 6,498 | -6,390 |
| F-39 | 6,846 | -6,738 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,150 | 6,162 | Perforated |
| 6,498 | 6,552 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,522 | 14.75 | 600 S |
| 2.375 | 6,416 | — | — |
| 7.625 | 7,576 | 9.875 | 870 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 7, 1986 | Jan 28, 1986 | Yes |
| 00 | Feb 1, 1986 | — | — |
| 00 | Jan 12, 1984 | Sep 29, 1982 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-32016 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-32016 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35532016, documented in the API reference.