TEXAS · WELLS · NUECES COUNTY · API 42-355-32814 · DISTRICT 04

Anderson William Jr. et Al #2

Y

Nueces County · Agua Dulce (Consolidated Frio) field · Producing  · Vertical

Anderson William JR. ET AL #2 (API 42-355-32814) is a well in Nueces County operated by Urban Oil & Gas Group LLC, completed May 5, 1996 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1990 and 1993, permitted to 8,400 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Urban Oil & Gas Group LLC on the wellbore schedule.

Completion filings report 3 formation tops, including U. Het, B-36, G-9.

No lease production has been reported under this well’s leases.

Operator of record

Urban Oil & Gas Group LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Plano, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
140
Phone
(972) 543-8800

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnion Pacific Resources Company
Production reportsUrban Oil & Gas Group, LLCthrough Apr 2026
Latest permitUnion Pacific Resources CompanyJan 25, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,400
total depth, ft
3
permits on file
Jan 25, 1993
last permit issued
May 5, 1996
completed
0
cumulative oil, bbl
1.14M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 5, 1996
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Anderson, William Jr. et Al G-4-137296Agua Dulce (Consolidated Frio)Urban Oil & Gas Group, LLC101.11MJan 1993 – Jul 2026
Anderson, William Jr. et Al G-4-144451Agua Dulce (6100)Union Pacific Resources Company1029.8KJan 1993 – May 1994
Anderson, William Jr. et Al G-4-137304Agua Dulce (F-21)Union Pacific Resources Company10533Jan 1993 – Jan 1993

Gas, mcf lease total

Last 12 months 17,215 · prior 12 16,147(+7%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Jan 1999
  2. 2Collins & Ware, Inc.Feb 1999 → Jun 2000
  3. 3Apache CorporationJul 2000 → Aug 2014
  4. 4Urban Oil & Gas Group, LLCSep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
408331-99RecompletionUnion Pacific Resources CompanyJan 21, 1993Jan 25, 1993Jan 16, 19939,010
373117-98DrillUnion Pacific Resources CompanyOct 31, 1990May 9, 1990—9,010
373117-99DrillUnion Pacific Resources CompanyMay 9, 1990May 9, 1990—9,010

Completions

CompletedLeaseFieldOperatorStatusDepth
May 5, 1996Anderson William Jr. et Al G-4-137296Agua Dulce (Consolidated Frio)Urban Oil & Gas Group LLCProducing8,400
Jan 18, 1993Anderson William Jr. et Al G-4-144451Agua Dulce (Consolidated Frio)Union Pacific Resources CompanyNot on Schedule—
Oct 5, 1990Anderson William Jr. et Al G-4-137304Agua Dulce (F-21)Union Pacific Resources CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 99 ft elevation.Download CSV →

FormationMD ftSubsea
U. Het3,730-3,631
B-364,719-4,620
G-96,879-6,780

Perforations

Perforated and open-hole intervals.

FromToType
5,9265,933Perforated
5,9845,989Perforated
6,0146,019Perforated
6,0746,080Perforated
6,3666,374Perforated
6,4186,432Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,19113.5540 S
10.751,19713.5540 S
2.8758,3858.75—
2.8758,385——
2.8758,3898.751,600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 9, 1995May 25, 1995—
00Jan 26, 1995Oct 3, 1994—
00Sep 20, 1994May 13, 1994—
00Apr 7, 1993Feb 4, 1993Yes
00Mar 30, 1993——
00Apr 11, 1991Nov 1, 1990Yes
00Mar 22, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35532814, documented in the API reference.