WELL · 42-355-33086 · DISTRICT 4

Dugger L. M. #15

N

Nueces County · Minnie Bock N. (Upper Bertram) field  · Vertical

Dugger L. M. #15 (API 42-355-33086) is a well in Nueces County operated by Rincon Petroleum Corporation, completed September 6, 2002.

The RRC has issued 2 drilling permits between 1997 and 2005, permitted to 7,860 ft.

Completion filings report 6 formation tops, including Catahoula, Sinton, Miocene (undifferentiated), Bertram.

Its 2 leases have reported 209K barrels of oil and 487K mcf of gas since June 1997, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Rincon Petroleum Corporation

Based in
Corpus Chrsti, TX
P-5 status
Active (A)
P-5 last filed
Jun 18, 2026
Permits on file
259
Phone
(361) 883-9896

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRincon Petroleum Corporation
Production reportsSue-Ann Operating, L.C.through Nov 2010
Latest permitRincon Petroleum CorporationNov 4, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,860
total depth, ft
2
permits on file
Nov 4, 2005
last permit issued
Sep 6, 2002
completed
209K
cumulative oil, bbl
487K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 6, 2002
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dugger, L. M. G-4-214200Minnie Bock, N. (Z 15)Alegre Operating, Inc.10239KNov 2005 – Jul 2026
Dugger, L. M. O-4-12698Minnie Bock, N. (Upper Bertram)Rincon Petroleum Corporation1209K248KJun 1997 – Feb 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marquee CorporationJul 1997 → Jun 1999
  2. 2Rincon Petroleum CorporationJul 1999 → Dec 2007
  3. 3Sue-Ann Operating, L.C.Jan 2008 → Nov 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
608996-99RecompletionRincon Petroleum CorporationNov 4, 2005Nov 4, 2005Nov 5, 20057,860
463258-99DrillMarquee CorporationJun 4, 1997Jun 10, 1997Jun 20, 19977,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-214200————
—— O-4-12698————

Formation tops

As filed on W-2/G-1. Subsea from 70 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula3,900-3,830
Sinton5,100-5,030
Miocene (undifferentiated)MIOCENE5,300-5,230
Bertram6,855-6,785
Wardner7,090-7,020
Frio7,800-7,730

Perforations

Perforated and open-hole intervals.

FromToType
6866,870Perforated
6,5216,560Perforated
6,8846,887Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,14812.25565 S
4.57,5497.875885 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 12, 2006Nov 30, 2005Yes
00Feb 27, 2006——
00Oct 15, 2002Sep 18, 2002—
00Oct 14, 1997Aug 8, 1997Yes
00Sep 22, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35533086, documented in the API reference.