WELL · 42-355-33101 · DISTRICT 4

Chapman Ranch A #128

Shut in

Nueces County · Mobil-David (Howell Hight) field · Producing  · Directional

Chapman Ranch A #128 (API 42-355-33101) is a well in Nueces County operated by Decker Operating CO. L.L.C., completed February 20, 2007 and listed as producing on the RRC schedule, shut in March 1, 2023.

The RRC has issued 2 drilling permits (amended once) between 1997 and 2006, permitted to 13,070 ft.

Completion filings report one formation top, including Anderson.

No lease production has been reported under this well’s leases.

Operator of record

Decker Operating Co. L.L.C.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 4, 2026
Permits on file
137
Phone
(713) 880-4343

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDecker Operating Co. L.L.C.
Production reportsDecker Operating Co., L.L.C.through Feb 2023
Latest permitDecker Operating Co., L.L.C.Aug 18, 2006
13,070
total depth, ft
3
permits on file
Aug 18, 2006
last permit issued
Feb 20, 2007
completed
0
cumulative oil, bbl
1.81M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 20, 2007
Shut in
Mar 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chapman Ranch "A" G-4-227943Mobil-David (Howell Hight)Decker Operating Co., L.L.C.101.66MFeb 2007 – Jul 2026
Chapman, J. O. G-4-166735Mobil-David (Anderson)Decker Operating Co., L.L.C.10151KJan 1998 – Mar 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Jan 1998 → Aug 1999
  2. 2Shana Petroleum CompanySep 1999 → Apr 2002
  3. 3Neg Operating LLCMay 2002 → May 2004
  4. 4Decker Operating Co., L.L.C.Jun 2004 → Feb 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
624182-99RecompletionDecker Operating Co., L.L.C.Aug 10, 2006Aug 18, 2006Dec 5, 200613,750
468499-98DrillShell Western E&P Inc.Dec 11, 1997Oct 7, 1997Nov 3, 199713,600
468499-99DrillShell Western E&P Inc.Oct 7, 1997Oct 7, 1997—13,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 20, 2007Chapman Ranch A G-4-227943Mobil-David (Howell Hight)Decker Operating Co. L.L.C.Producing · shut in Mar 1, 202313,070
Jan 13, 1998Chapman J. O. G-4-166735Mobil-David (Anderson)Decker Operating Co. L.L.C.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 43 ft elevation.Download CSV →

FormationMD ftSubsea
Anderson11,026-10,983

Perforations

Perforated and open-hole intervals.

FromToType
11,05011,074Perforated
11,07811,088Perforated
12,59112,596Perforated
12,72512,730Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,55014.75801 S
7.62510,0229.8751,781 S
3.513,1964.75110 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 16, 2007Jun 5, 2007Yes
00Jul 12, 2007——
00Mar 16, 1998Feb 19, 1998Yes
00Mar 5, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35533101, documented in the API reference.