TEXAS · WELLS · NUECES COUNTY · API 42-355-33514 · DISTRICT 04

Cryer #1D

Plugged

Nueces County · Clarkwood S. (Lower McKamey) field  · Vertical

Cryer #1D (API 42-355-33514) is a plugged well in Nueces County, plugged January 16, 2004, last operated by Eog Resources Inc..

The RRC has issued 2 drilling permits (amended once) between 2002 and 2003, permitted to 10,800 ft.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Frio, Lehman Sand.

Operator of record

EOG Resources Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,348
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Dec 2003
Latest permitEOG Resources, Inc.May 20, 2003
10,800
total depth, ft
3
permits on file
May 20, 2003
last permit issued
May 16, 2003
completed
0
cumulative oil, bbl
55.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2003 THROUGH Mar 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 16, 2003
Shut in
—
Plugged
Jan 16, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cryer G-4-193841Clarkwood, S. (Lower McKamey)EOG Resources, Inc.1055.4KFeb 2003 – Mar 2004
Cryer G-4-193842Airport (Morris)EOG Resources, Inc.100Jan 2003 – Jan 2004
Cryer G-4-195105WildcatEOG Resources, Inc.100May 2003 – Jan 2004
Cryer G-4-195106Clarkwood, S. (Watson)EOG Resources, Inc.100May 2003 – Jan 2004
Cryer G-4-195107Clarkwood, S. (Moore)EOG Resources, Inc.100May 2003 – Jan 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Feb 2003 → Dec 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
532169-99RecompletionEOG Resources, Inc.May 20, 2003May 20, 2003May 15, 200310,800
526838-98DrillEOG Resources, Inc.Mar 27, 2003Dec 31, 2002—10,800
526838-99DrillEOG Resources, Inc.Dec 31, 2002Dec 31, 2002Jan 10, 200310,800

Completions

CompletedLeaseFieldOperatorStatusDepth
May 16, 2003Cryer G-4-195106Clarkwood S. (Watson)EOG Resources Inc.Plugged—
May 16, 2003Cryer G-4-195107Clarkwood S. (Moore)EOG Resources Inc.Plugged—
May 16, 2003Cryer G-4-193841Clarkwood S. (Lower McKamey)EOG Resources Inc.Plugged—
May 16, 2003Cryer G-4-195105WildcatEOG Resources Inc.Plugged—
Jan 28, 2003Cryer G-4-193842Airport (Morris)EOG Resources Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 47 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)BASE MIOCENE4,710-4,663
FrioTOP FRIO5,103-5,056
Lehman Sand8,710-8,663

Perforations

Perforated and open-hole intervals.

FromToType
9,5359,600Perforated
9,6909,700Perforated
9,8989,910Perforated
10,10410,108Perforated
10,23510,245Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,50012.25910 S
2.87510,4208.5655 S
2.87510,4298.5655 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 22, 2003Jul 30, 2003—
00Sep 19, 2003Jul 22, 2003—
00Jul 10, 2003Jun 4, 2003—
00Jun 30, 2003——
00May 5, 2003Mar 18, 2003Yes
00Apr 15, 2003——
00Apr 14, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35533514, documented in the API reference.