TEXAS · WELLS · NUECES COUNTY · CHAPMAN RANCH LEASE · API 42-355-33851 · DISTRICT 04

Chapman Ranch #23

Shut in

Nueces County · Mobil-David (Frio 12 600) field · Temp Abandoned  · Vertical

Chapman Ranch #23 (API 42-355-33851) is a well in Nueces County operated by Proline Energy Resources Inc, completed September 21, 2007 and listed as temp abandoned on the RRC schedule, shut in September 1, 2019.

The RRC has issued one drilling permit (amended once), issued June 11, 2007, permitted to 12,998 ft.

It was permitted by Edge Petroleum Oper. CO., Inc. and has since transferred to Proline Energy Resources Inc on the wellbore schedule.

Completion filings report 3 formation tops, including Lehman, Anderson, Howell Hight.

No lease production has been reported under this well’s leases.

Operator of record

Proline Energy Resources Inc

Permitted by Edge Petroleum Oper. Co., Inc.; the EWA schedule now lists a different operator.

Based in
Sugar Land, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Phone
(832) 886-4420

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleProline Energy Resources Inc
Production reportsUrban Oil & Gas Group, LLCthrough Aug 2019
Latest permitEdge Petroleum Oper. Co., Inc.Jun 11, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,998
total depth, ft
2
permits on file
Jun 11, 2007
last permit issued
Sep 21, 2007
completed
0
cumulative oil, bbl
869K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 21, 2007
Shut in
Sep 1, 2019
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chapman Ranch G-4-231911Mobil-David (Frio 12,600)Proline Energy Resources Inc10869KAug 2007 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Edge Petroleum Oper. Co., Inc.Aug 2007 → Nov 2010
  2. 2Apache CorporationDec 2010 → Jun 2014
  3. 3Urban Oil & Gas Group, LLCJul 2014 → Aug 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
640027-98DrillEdge Petroleum Oper. Co., Inc.Jun 13, 2007Jun 11, 2007Jun 25, 200713,500
640027-99DrillEdge Petroleum Oper. Co., Inc.Jun 1, 2007Jun 11, 2007—13,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 21, 2007Chapman Ranch G-4-231911Mobil-David (Frio 12 600)Proline Energy Resources IncTemp Abandoned · shut in Sep 1, 201912,998

Formation tops

As filed on W-2/G-1. Subsea from 41 ft elevation.Download CSV →

FormationMD ftSubsea
Lehman10,076-10,035
Anderson11,530-11,489
Howell Hight12,614-12,573

Perforations

Perforated and open-hole intervals.

FromToType
12,63712,651Perforated
12,68012,684Perforated
12,68712,697Perforated
12,73412,739Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,53917.51,780 S
9.62510,75512.25705 S
4.513,0008.51,175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 2008Oct 16, 2007Yes
00Jan 2, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35533851, documented in the API reference.