TEXAS · WELLS · OCHILTREE COUNTY · API 42-357-02214 · DISTRICT 08

Daniel S. P. #2C

Shut in

Ochiltree County · Hansford (Morrow Upper) field · Temp Abandoned  · Vertical

Daniel S. P. #2C (API 42-357-02214) is a well in Ochiltree County operated by Diamond S Energy Company, completed August 17, 1995 and listed as temp abandoned on the RRC schedule, shut in March 1, 2024.

The RRC has issued one drilling permit, issued July 17, 1995, permitted to 8,232 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Diamond S Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Daniel (Atoka Lime), Hansford (Morrow Upper).

No lease production has been reported under this well’s leases.

Operator of record

Diamond S Energy Company

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
1
Phone
(817) 263-3505

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiamond S Energy Company
Production reportsDiamond S Energy Companythrough Feb 2024
Latest permitTexaco E & P Inc.Jul 17, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,232
total depth, ft
1
permits on file
Jul 17, 1995
last permit issued
Aug 17, 1995
completed
0
cumulative oil, bbl
516K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 17, 1995
Shut in
Mar 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Daniels, S. P. GU G-14-28453Hansford (Morrow, Lower)Diamond S Energy Company1016.5KJan 1993 – Jul 2026
Daniel, S. P. G-14-162811Hansford (Morrow, Upper)Diamond S Energy Company10500KAug 1995 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Aug 1997
  2. 2Gunsmoke Energy CompanyNov 2008 → Apr 2012
  3. 3Diamond S Energy CompanyMay 2012 → Feb 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
437082-99RecompletionTexaco E & P Inc.Jun 20, 1995Jul 17, 1995Aug 9, 19958,078

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 17, 1995Daniel S. P. G-14-162811Hansford (Morrow Upper)Diamond S Energy CompanyTemp Abandoned · shut in Mar 1, 20248,232
May 14, 1960Daniels S. P. GU G-14-28453Hansford (Morrow Lower)Diamond S Energy CompanyPartial Plug · shut in Jan 1, 19988,232

Formation tops

As filed on W-2/G-1. Subsea from 3,060 ft elevation.Download CSV →

FormationMD ftSubsea
Daniel (Atoka Lime)7,300-4,240
Hansford (Morrow Upper)7,547-4,487

Perforations

Perforated and open-hole intervals.

FromToType
7,3007,335Perforated
7,5477,622Perforated
8,0278,041Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,90012.25900 S
2.8758,2267.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 30, 1997Sep 26, 1996Yes
00May 22, 1997——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35702214, documented in the API reference.