TEXAS · WELLS · OCHILTREE COUNTY · BROWNLEE BROS.-COOK LEASE · API 42-357-30880 · DISTRICT 08

Brownlee Bros.-Cook #2

Y

Ochiltree County · Northrup (Cleveland) field · Producing  · Vertical

Brownlee Bros.-Cook #2 (API 42-357-30880) is a well in Ochiltree County operated by Presidio Petroleum LLC, completed February 26, 1979 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 22, 1978, permitted to 7,258 ft.

It was permitted by Diamond Chemicals Company and has since transferred to Presidio Petroleum LLC on the wellbore schedule.

Its lease has reported 442 barrels of oil and 313K mcf of gas since January 1993, last reporting volume in April 2026.

Operator of record

Presidio Petroleum LLC

Permitted by Diamond Chemicals Company; the EWA schedule now lists a different operator.

Based in
Canadian, TX
P-5 status
Active (A)
P-5 last filed
May 1, 2026
Permits on file
13
Phone
(806) 217-4483

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePresidio Petroleum LLC
Production reportsPresidio Petroleum LLCthrough Apr 2026
Latest permitDiamond Chemicals CompanyDec 22, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,258
total depth, ft
1
permits on file
Dec 22, 1978
last permit issued
Feb 26, 1979
completed
442
cumulative oil, bbl
313K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 26, 1979
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brownlee Bros.-Cook G-14-81518Northrup (Cleveland)Presidio Petroleum LLC1442313KJan 1993 – Apr 2026

Gas, mcf lease total

Last 12 months 4,894 · prior 12 4,924(-1%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maxus Exploration CompanyJan 1993 → Jan 1995
  2. 2Midgard Energy CompanyFeb 1995 → Sep 1997
  3. 3Crescendo Resources, L.P.Oct 1997 → Mar 2000
  4. 4Apache CorporationApr 2000 → Apr 2016
  5. 5Wildhorse Operating CompanyOct 2016 → Dec 2017
  6. 6Le Norman Operating LLCJan 2018 → Jun 2019
  7. 7Templar Operating LLCJul 2019 → Dec 2019
  8. 8Presidio Petroleum LLCJan 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
39474-99DrillDiamond Chemicals CompanyDec 22, 1978Dec 22, 1978Jan 18, 19797,250

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 26, 1979Brownlee Bros.-Cook G-14-81518Northrup (Cleveland)Presidio Petroleum LLCProducing7,258

Perforations

Perforated and open-hole intervals.

FromToType
7,1247,166Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,400—950 S
5.57,253—150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35730880, documented in the API reference.