TEXAS · WELLS · OCHILTREE COUNTY · API 42-357-30932 · DISTRICT 08

Judice #2

Plugged

Ochiltree County · Pan Petro (Cleveland) field  · Vertical

Judice #2 (API 42-357-30932) is a plugged well in Ochiltree County, plugged April 11, 2025, last operated by Mewbourne Oil Company.

The RRC has issued 2 drilling permits between 1979 and 1983, permitted to 9,000 ft.

Completion filings report 6 formation tops, including Cleveland, Marmaton, Novi, 13 Finger Lime.

Its 2 leases have reported 8.23K barrels of oil and 734K mcf of gas since January 1993, last reporting in April 2025. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

Mewbourne Oil Company

Based in
Tyler, TX
P-5 status
Active (A)
P-5 last filed
May 21, 2026
Permits on file
2,061
Phone
(903) 561-2900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMewbourne Oil Company
Production reportsMewbourne Oil Companythrough Aug 2022
Latest permitMewbourne Oil Co.May 12, 1983
9,000
total depth, ft
2
permits on file
May 12, 1983
last permit issued
Mar 12, 2000
completed
8.23K
cumulative oil, bbl
734K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 12, 2000
Shut in
—
Plugged
Apr 11, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Judice G-14-176461Pan Petro (Cleveland)Mewbourne Oil Company10230KMar 2000 – Apr 2025
Judice O-14-4414Buler, North (Cleveland)Mewbourne Oil Company68.23K503KJan 1993 – Jun 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mewbourne Oil CompanyJan 1993 → Aug 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
194590-99RecompletionMewbourne Oil Co.May 12, 1983May 12, 1983—7,500
57167-99DrillMewbourne Oil Co.Sep 5, 1979Sep 5, 1979Oct 18, 19799,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 12, 2000Judice G-14-176461Pan Petro (Cleveland)Mewbourne Oil CompanyPlugged—
Jun 13, 1984Judice O-14-4414Buler North (Cleveland)Mewbourne Oil CompanyPlugged—
Nov 28, 1979Judice O-14-4514Hardy (Morrow Upper)Mewbourne Oil CompanyPlugged—
Nov 28, 1979Judice G-14-95045Hardy (Morrow Upper)Mewbourne Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,979 ft elevation.Download CSV →

FormationMD ftSubsea
ClevelandUPPER CLEVELAND7,059-4,080
ClevelandLOWER CLEVELAND7,169-4,190
Marmaton8,196-5,217
Novi8,238-5,259
13 Finger Lime8,322-5,343
MorrowMORROW SHALE8,430-5,451
U. Morrow Sand8,610-5,631

Perforations

Perforated and open-hole intervals.

FromToType
7,0577,062Perforated
7,0577,096Perforated
7,0667,072Perforated
7,0767,096Perforated
7,1717,197Perforated
8,6108,623Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,72112.251,000 S
2.3757,085——
2.3758,482——
4.58,7477.875350 sx
4.58,7487.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 26, 2000Mar 15, 2000—
00Apr 13, 2000——
00Jul 10, 1984Jun 27, 1984—
00Jan 12, 1984Jun 27, 1984—
00Jan 12, 1984Aug 13, 1981—
00Jan 12, 1984Dec 31, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35730932, documented in the API reference.