TEXAS · WELLS · OCHILTREE COUNTY · DREW ELLIS -ET- -AL- LEASE · API 42-357-31324 · DISTRICT 08

Drew Ellis -et- -Al- #3

Y

Ochiltree County · Pan Petro (Cleveland) field · Producing  · Vertical

Drew Ellis -ET- -AL- #3 (API 42-357-31324) is a well in Ochiltree County operated by Latigo Petroleum LLC, completed December 6, 1982 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 5, 1982, permitted to 7,000 ft.

It was permitted by Diamond Chemicals Company and has since transferred to Latigo Petroleum LLC on the wellbore schedule.

Its lease has reported 1.9K barrels of oil and 1.71M mcf of gas since January 1993, last reporting volume in March 2026.

Operator of record

Latigo Petroleum LLC

Permitted by Diamond Chemicals Company; the EWA schedule now lists a different operator.

Based in
Pampa, TX
P-5 status
Active (A)
P-5 last filed
Jul 17, 2025
Permits on file
76
Phone
(806) 665-8441

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLatigo Petroleum LLC
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitDiamond Chemicals CompanyOct 5, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
1
permits on file
Oct 5, 1982
last permit issued
Dec 6, 1982
completed
1.9K
cumulative oil, bbl
1.71M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 6, 1982
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Drew Ellis -et- -Al- G-14-103595Pan Petro (Cleveland)Latigo Petroleum, LLC11.9K1.71MJan 1993 – Mar 2026

Gas, mcf lease total

Last 12 months 13,901 · prior 12 11,497(+21%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maxus Exploration CompanyJan 1993 → Jan 1995
  2. 2Midgard Energy CompanyFeb 1995 → Sep 1997
  3. 3Crescendo Resources, L.P.Oct 1997 → Mar 2000
  4. 4Amoco Production CompanyApr 2000 → Dec 2001
  5. 5BP America Production CompanyJan 2002 → Feb 2020
  6. 6Latigo Petroleum, LLCMar 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
173724-99DrillDiamond Chemicals CompanyOct 5, 1982Oct 5, 1982Oct 12, 19827,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 6, 1982Drew Ellis -et- -Al- G-14-103595Pan Petro (Cleveland)Latigo Petroleum LLCProducing7,000

Perforations

Perforated and open-hole intervals.

FromToType
6,7426,858Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,59812.251,250 S
2.3756,704——
5.57,0007.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Dec 21, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35731324, documented in the API reference.