TEXAS · WELLS · OCHILTREE COUNTY · API 42-357-31706 · DISTRICT 08

Rifenburg Ida O. #3

Plugged

Ochiltree County · Farnsworth SE. (Cleveland) field  · Vertical

Rifenburg Ida O. #3 (API 42-357-31706) is a plugged well in Ochiltree County, plugged May 14, 2009, last operated by Apache Corporation.

The RRC has issued 3 drilling permits between 1985 and 2002, permitted to 9,010 ft.

Completion filings report 17 formation tops, including Bd, Doug, Douglas, Kansas City.

Operator of record

Apache Corporation

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,757
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough Feb 2009
Latest permitApache CorporationJan 11, 2002
9,010
total depth, ft
3
permits on file
Jan 11, 2002
last permit issued
Apr 8, 2002
completed
0
cumulative oil, bbl
609K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 8, 2002
Shut in
—
Plugged
May 14, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rifenburg, Ida O. G-14-135093Farnsworth, SE. (Cleveland)Apache Corporation10609KJan 1993 – May 2009
— G-14-118890——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maxus Exploration CompanyJan 1993 → Jan 1995
  2. 2Midgard Energy CompanyFeb 1995 → Sep 1997
  3. 3Crescendo Resources, L.P.Oct 1997 → Mar 2000
  4. 4Apache CorporationApr 2000 → Feb 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
516729-99RecompletionApache CorporationJan 10, 2002Jan 11, 2002Jan 17, 20029,010
374261-99RecompletionMaxus Exploration CompanyJun 8, 1990Jun 14, 1990—9,010
273056-99DrillDiamond Shamrock Exploration Co.Apr 19, 1985Apr 22, 1985Aug 12, 19858,950

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 8, 2002Rifenburg Ida O. G-14-135093Farnsworth SE. (Cleveland)Apache CorporationPlugged—
Oct 1, 1985Rifenburg Ida O. G-14-118890Farnsworth East (Morrow Upper)Maxus Exploration CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,995 ft elevation.Download CSV →

FormationMD ftSubsea
BD3,363-368
Doug5,523-2,528
Douglas5,523-2,528
Kansas City6,616-3,621
KC6,616-3,621
Cleveland6,756-3,761
Cleve Pay6,756-3,761
Des Moines6,978-3,983
Atoka7,785-4,790
Atoka7,833-4,838
AtokaATOKA PAY7,833-4,838
13 FL7,920-4,925
Morrow8,032-5,037
MW8,032-5,037
NW8,032-5,037
U MW Sand8,222-5,227
U/MW Sand8,222-5,227
Squaw Belly8,508-5,513
MississippianMISS8,952-5,957
Mississippian8,952-5,957

Perforations

Perforated and open-hole intervals.

FromToType
6,7866,792Perforated
6,7966,802Perforated
6,8116,816Perforated
7,0067,022Perforated
8,2258,230Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,19512.251,550 S
5.58,5197.875600 S
4.58,5197.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 10, 2002May 14, 2002—
00Jun 18, 2002Mar 26, 2002—
00Jul 9, 1997May 14, 1997—
00Nov 27, 1990—Yes
00Jul 18, 1990——
00Dec 13, 1985Oct 11, 1985Yes
00Nov 28, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35731706, documented in the API reference.