TEXAS · WELLS · OCHILTREE COUNTY · API 42-357-31816 · DISTRICT 08

Milledge #2

Plugged

Ochiltree County · Pan Petro (Cleveland) field  · Vertical

Milledge #2 (API 42-357-31816) is a plugged well in Ochiltree County, plugged July 12, 2021, last operated by Mewbourne Oil Company.

The RRC has issued 2 drilling permits between 1986 and 1998, permitted to 8,000 ft.

Completion filings report 6 formation tops, including Brown Dolomite, Pennsylvanian, Base Of Heebner, Kansas City.

Its 2 leases have reported 4.24K barrels of oil and 191K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Mewbourne Oil Company

Based in
Tyler, TX
P-5 status
Active (A)
P-5 last filed
May 21, 2026
Permits on file
2,061
Phone
(903) 561-2900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMewbourne Oil Company
Production reportsMewbourne Oil Companythrough Apr 2018
Latest permitMewbourne Oil Co.Aug 5, 1998
8,000
total depth, ft
2
permits on file
Aug 5, 1998
last permit issued
Aug 20, 1998
completed
4.24K
cumulative oil, bbl
191K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 20, 1998
Shut in
—
Plugged
Jul 12, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Milledge G-14-170721Pan Petro (Cleveland)Mewbourne Oil Company1452109KAug 1998 – Apr 2018
Milledge O-14-6335Pshigoda, N. (Des Moines)Mewbourne Oil Company43.78K82.3KJan 1993 – Jul 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mewbourne Oil CompanyJan 1993 → Apr 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
477825-99RecompletionMewbourne Oil Co.Jul 10, 1998Aug 5, 1998Aug 11, 19988,000
297457-99DrillMewbourne Oil Co.Feb 4, 1986Feb 5, 1986Jun 28, 19868,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 20, 1998Milledge G-14-170721Pan Petro (Cleveland)Mewbourne Oil CompanyPlugged—
Jul 29, 1986Milledge O-14-6335Pshigoda N. (Des Moines)Mewbourne Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,959 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,356-397
PennsylvanianPENN SHALE4,600-1,641
Base of Heebner5,487-2,528
Kansas City6,408-3,449
MarmatonUPPER MARMATON6,647-3,688
Cleveland6,652-3,693

Perforations

Perforated and open-hole intervals.

FromToType
6,6786,718Perforated
6,9066,954Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,59712.25900 S
4.57,0707.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 21, 1998Sep 8, 1998Yes
00Nov 13, 1998——
00Aug 20, 1986Aug 8, 1986Yes
00Aug 16, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35731816, documented in the API reference.