WELL · 42-357-32185 · DISTRICT 10
Halliburton #2
Ochiltree County · Ellis Ranch (Hepler) field · Vertical
Halliburton #2 (API 42-357-32185) is a plugged well in Ochiltree County, plugged December 22, 2004, last operated by BP America Production Company.
The RRC has issued 2 drilling permits (amended once) between 1997 and 1999, permitted to 9,300 ft.
It was permitted by Crescendo Resources, L.P. and has since transferred to BP America Production Company on the wellbore schedule.
Completion filings report 13 formation tops, including Brn Dol, Brown Dolomite, Doug, Douglas.
Its 2 leases have reported 7.66K barrels of oil and 49.1K mcf of gas since July 1997, last reporting in July 2005. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Crescendo Resources, L.P.; the EWA schedule now lists a different operator.
- Based in
- Denver, CO
- P-5 status
- Active (A)
- P-5 last filed
- Jun 26, 2026
- Permits on file
- 1,623
- Phone
- (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BP America Production Company |
| Production reports | BP America Production Companythrough Feb 2003 |
| Latest permit | Crescendo Resources, L.P.Jan 20, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,300
- total depth, ft
- 3
- permits on file
- Jan 20, 1999
- last permit issued
- Dec 21, 1998
- completed
- 7.66K
- cumulative oil, bbl
- 49.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Jul 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 21, 1998
- Shut in
- —
- Plugged
- Dec 22, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Halliburton O-14-7298 | Ellis Ranch (Hepler) | BP America Production Company | 1 | 4.4K | 29.6K | Dec 1998 – Jul 2005 |
| Halliburton O-14-7216 | Ellis Ranch (Cleveland) | Crescendo Resources, L.P. | 1 | 3.26K | 19.4K | Jul 1997 – Jan 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Crescendo Resources, L.P.Jul 1997 → Mar 2000
- 2Amoco Production CompanyApr 2000 → Dec 2001
- 3BP America Production CompanyJan 2002 → Dec 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 482057-99 | Recompletion | Crescendo Resources, L.P. | Jan 15, 1999 | Jan 20, 1999 | Sep 3, 1998 | 7,654 |
| 457171-98 | Drill | Crescendo Resources, L.P. | Sep 3, 1997 | Jan 14, 1997 | — | 7,810 |
| 457171-99 | Drill | Midgard Energy Company | Jan 9, 1997 | Jan 14, 1997 | May 19, 1997 | 9,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 21, 1998 | Halliburton O-14-7298 | Ellis Ranch (Hepler) | BP America Production Company | Plugged | — |
| Jul 3, 1997 | Halliburton O-14-7216 | Ellis Ranch (Cleveland) | Crescendo Resources L.P. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,806 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BRN Dol | 3,415 | -609 |
| Brown Dolomite | 3,415 | -609 |
| Doug | 5,856 | -3,050 |
| Douglas | 5,856 | -3,050 |
| Kansas City | 6,794 | -3,988 |
| Cleve Pay | 7,270 | -4,464 |
| Hepler | 7,459 | -4,653 |
| Des Moines | 7,526 | -4,720 |
| Cherokee | 8,030 | -5,224 |
| Atoka | 8,425 | -5,619 |
| 13 Finer Lime | 8,562 | -5,756 |
| 13 Finger Lm. | 8,562 | -5,756 |
| Morrow | 8,668 | -5,862 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,272 | 7,293 | Perforated |
| 7,321 | 7,344 | Perforated |
| 7,470 | 7,492 | Perforated |
| 7,584 | 7,590 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,080 | 12.25 | 1,220 S |
| 5.5 | 7,810 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 4, 1999 | Jan 19, 1999 | — |
| 00 | Jan 27, 1999 | — | — |
| 00 | Oct 6, 1997 | Aug 25, 1997 | Yes |
| 00 | Oct 1, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-357-32185 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-357-32185 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35732185, documented in the API reference.