TEXAS · WELLS · OCHILTREE COUNTY · JONES, M. C. LEASE · API 42-357-32211 · DISTRICT 08

Jones M. C. #5

Y

Ochiltree County · Pan Petro (Cleveland) field · Producing  · Vertical

Jones M. C. #5 (API 42-357-32211) is a well in Ochiltree County operated by Highmark Energy Operating LLC, completed October 8, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 3, 1997, permitted to 7,100 ft.

It was permitted by Exxon Corp. and has since transferred to Highmark Energy Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Kansas City, Cleveland.

Its lease has reported 818 barrels of oil and 459K mcf of gas since October 1997, last reporting volume in April 2026.

Operator of record

Highmark Energy Operating LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 9, 2026
Permits on file
23
Phone
(469) 214-5299

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHighmark Energy Operating LLC
Production reportsHighmark Energy Operating, LLCthrough Apr 2026
Latest permitExxon Corp.Jul 3, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,100
total depth, ft
1
permits on file
Jul 3, 1997
last permit issued
Oct 8, 1997
completed
818
cumulative oil, bbl
459K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1997 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 8, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jones, M. C. G-14-166169Pan Petro (Cleveland)Highmark Energy Operating, LLC1818459KOct 1997 – Apr 2026

Gas, mcf lease total

Last 12 months 2,223 · prior 12 5,026(-56%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Oct 1997 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jun 2013
  3. 3XTO Energy Inc.Jul 2013 → Sep 2022
  4. 4Highmark Energy Operating, LLCOct 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
464569-99DrillExxon Corp.Jul 3, 1997Jul 3, 1997Jul 30, 19977,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 8, 1997Jones M. C. G-14-166169Pan Petro (Cleveland)Highmark Energy Operating LLCProducing7,100

Formation tops

As filed on W-2/G-1. Subsea from 2,941 ft elevation.Download CSV →

FormationMD ftSubsea
Kansas City6,440-3,499
ClevelandUPPER CLEVELAND6,722-3,781
ClevelandLOWER CLEVELAND MKR6,818-3,877
ClevelandLOWER CLEVELAND SS6,919-3,978

Perforations

Perforated and open-hole intervals.

FromToType
6,7416,761Perforated
6,7766,794Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,77912.25975 S
4.57,1007.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 11, 1998Nov 6, 1997Yes
00Feb 3, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35732211, documented in the API reference.