TEXAS · WELLS · OCHILTREE COUNTY · DUDE WILSON GAS UNIT 6 LEASE · API 42-357-32229 · DISTRICT 08

Dude Wilson Gas Unit 6 #3

Y

Ochiltree County · Pan Petro (Cleveland) field · Producing  · Vertical

Dude Wilson Gas Unit 6 #3 (API 42-357-32229) is a well in Ochiltree County operated by Highmark Energy Operating LLC, completed March 3, 1998 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 29, 1997, permitted to 7,150 ft.

It was permitted by Exxon Corp. and has since transferred to Highmark Energy Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Douglas, Kansas City, Upr. Cleveland.

Its lease has reported 515 barrels of oil and 456K mcf of gas since March 1998, last reporting volume in April 2026.

Operator of record

Highmark Energy Operating LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 9, 2026
Permits on file
23
Phone
(469) 214-5299

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHighmark Energy Operating LLC
Production reportsHighmark Energy Operating, LLCthrough Apr 2026
Latest permitExxon Corp.Dec 29, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,150
total depth, ft
1
permits on file
Dec 29, 1997
last permit issued
Mar 3, 1998
completed
515
cumulative oil, bbl
456K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 3, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dude Wilson Gas Unit 6 G-14-168079Pan Petro (Cleveland)Highmark Energy Operating, LLC1515456KMar 1998 – Apr 2026

Gas, mcf lease total

Last 12 months 3,727 · prior 12 3,698(+1%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Mar 1998 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jun 2013
  3. 3XTO Energy Inc.Jul 2013 → Sep 2022
  4. 4Highmark Energy Operating, LLCOct 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
471652-99DrillExxon Corp.Dec 29, 1997Dec 29, 1997Jan 15, 19987,150

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 3, 1998Dude Wilson Gas Unit 6 G-14-168079Pan Petro (Cleveland)Highmark Energy Operating LLCProducing7,150

Formation tops

As filed on W-2/G-1. Subsea from 2,909 ft elevation.Download CSV →

FormationMD ftSubsea
DouglasDOUGLAS SD.5,690-2,781
Kansas City6,568-3,659
Upr. Cleveland6,881-3,972

Perforations

Perforated and open-hole intervals.

FromToType
6,9066,918Perforated
6,9386,953Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,80412.25955 S
4.57,1507.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 15, 1998Apr 2, 1998Yes
00May 28, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35732229, documented in the API reference.