TEXAS · WELLS · OCHILTREE COUNTY · THOMSON, H. B. LEASE · API 42-357-32587 · DISTRICT 08

Thomson H. B. #5H

Shut in

Ochiltree County · Share (Des Moines Upper) field · Shut In  · Horizontal

Thomson H. B. #5H (API 42-357-32587) is a horizontal well in Ochiltree County operated by High River Res Operating LLC, completed January 13, 2007 and listed as shut in on the RRC schedule, shut in June 1, 2009.

The RRC has issued one drilling permit, issued June 19, 2006, permitted to 6,571 ft.

It was permitted by Texas American Resources Company and has since transferred to High River Res Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Des Moines, No Log.

Its lease has reported 7.63K barrels of oil and 2.29K mcf of gas since May 2006, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

High River Res Operating LLC

Permitted by Texas American Resources Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Sep 22, 2025
Permits on file
6
Phone
(214) 760-6736

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHigh River Res Operating LLC
Production reportsQuanah Panhandle, LLCthrough Mar 2017
Latest permitTexas American Resources CompanyJun 19, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,571
total depth, ft
1
permits on file
Jun 19, 2006
last permit issued
Jan 13, 2007
completed
7.63K
cumulative oil, bbl
2.29K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 13, 2007
Shut in
Jun 1, 2009
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thomson, H. B. O-14-7651Share (Des Moines, Upper)High River Res Operating, LLC37.63K2.29KMay 2006 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texas American Resources CompanyMay 2006 → Apr 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
621242-99DrillTexas American Resources CompanyJun 19, 2006Jun 19, 2006Aug 20, 20066,571

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 13, 2007Thomson H. B. O-14-7651Share (Des Moines Upper)High River Res Operating LLCShut In · shut in Jun 1, 20096,571

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Des Moines6,480
NO Log—

Perforations

Perforated and open-hole intervals.

FromToType
6,8447,450Perforated
7,6238,230Perforated
8,4238,941Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,60012.25756 S
76,9148.75225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 28, 2007Mar 8, 2007Yes
00Nov 19, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35732587, documented in the API reference.