TEXAS · WELLS · OCHILTREE COUNTY · API 42-357-32851 · DISTRICT 08

Jesse Brownlee 50 #1H

Y

Ochiltree County · Pan Petro (Cleveland) field · Producing  · Horizontal

Jesse Brownlee 50 #1H (API 42-357-32851) is a horizontal well in Ochiltree County operated by Mewbourne Oil Company, completed November 27, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 18, 2009, permitted to 7,688 ft.

Completion filings report 3 formation tops, including Pennsylvanian, Heebner Shale, Cleveland.

Its 2 leases have reported 197K barrels of oil and 1.36M mcf of gas since November 2010, last reporting volume in April 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Mewbourne Oil Company

Based in
Tyler, TX
P-5 status
Active (A)
P-5 last filed
May 21, 2026
Permits on file
2,061
Phone
(903) 561-2900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMewbourne Oil Company
Production reportsMewbourne Oil Companythrough Apr 2026
Latest permitMewbourne Oil CompanySep 18, 2009
7,688
total depth, ft
2
permits on file
Sep 18, 2009
last permit issued
Nov 27, 2010
completed
197K
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2010 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 27, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jesse Brownlee "50" O-14-8502Pan Petro (Cleveland)Mewbourne Oil Company3182K1.31MMay 2011 – Apr 2026
Jesse Brownlee "50" O-14-8426Dutcher (Cleveland)Mewbourne Oil Company115.2K52.9KNov 2010 – Apr 2011

Gas, mcf lease total

Last 12 months 25,718 · prior 12 31,725(-19%)

02K4K202420252026

Oil, barrels lease total

Last 12 months 2,571 · prior 12 3,564(-28%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mewbourne Oil CompanyNov 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
685257-98DrillMewbourne Oil CompanyOct 6, 2009Sep 18, 2009Sep 30, 20108,000
685257-99DrillMewbourne Oil CompanySep 18, 2009Sep 18, 2009Sep 30, 20108,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 27, 2010Jesse Brownlee 50 O-14-8502Pan Petro (Cleveland)Mewbourne Oil CompanyProducing7,688
Nov 27, 2010Jesse Brownlee 50 O-14-8426Dutcher (Cleveland)Mewbourne Oil CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,901 ft elevation.Download CSV →

FormationMD ftSubsea
PennsylvanianPENN SHALE4,450-1,549
Heebner Shale5,685-2,784
Cleveland7,673-4,772

Perforations

Perforated and open-hole intervals.

FromToType
8,05911,993Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,02012.25950 S
78,0258.75250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 13, 2012Dec 9, 2010—
00Apr 30, 2012Dec 9, 2010—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35732851, documented in the API reference.