WELL · 42-359-30255 · DISTRICT 10

Rafter -O- Ranch #1

Plugged

Oldham County · Rafter -0- Ranch field  · Vertical

Rafter -O- Ranch #1 (API 42-359-30255) is a plugged well in Oldham County, plugged May 1, 2008, last operated by Rio Petroleum Inc..

The RRC has issued one drilling permit, issued July 18, 1984, permitted to 7,500 ft.

It was permitted by Baker & Taylor Drilling CO. and has since transferred to Rio Petroleum Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Cimarron Anhydrite, Red Cave, Brown Dolomite, T/Pennsylvanian.

Operator of record

Rio Petroleum Inc.

Permitted by Baker & Taylor Drilling Co.; the EWA schedule now lists a different operator.

Amarillo, TX · P-5 Y, filed Jul 4, 2026 · 128 permits on file · (806) 290-4855

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRio Petroleum Inc.
Production reportsnone
Latest permitBaker & Taylor Drilling Co.Jul 18, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
Jul 18, 1984
last permit issued
Dec 20, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 20, 1984
Shut in
—
Plugged
May 1, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rafter -O- Ranch G-14-115411Rafter -0- RanchRio Petroleum, Inc.100Jan 1993 – Apr 2008

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
245392-99DrillBaker & Taylor Drilling Co.Jul 13, 1984Jul 18, 1984Aug 3, 19847,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-115411————

Formation tops

As filed on W-2/G-1. Subsea from 3,638 ft elevation.Download CSV →

FormationMD ftSubsea
Cimarron Anhydrite2,919719
Red Cave3,461177
Brown Dolomite4,357-719
T/Pennsylvanian6,150-2,512
CanyonCANYON GRANITE WASH6,390-2,752
Pre-Cambrian6,689-3,051

Perforations

Perforated and open-hole intervals.

FromToType
6,4026,464Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,20811600 S
5.56,8127.125250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 2, 1985Jan 24, 1985—
00Mar 26, 1985Jan 8, 1985—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35930255, documented in the API reference.