WELL · 42-359-30312 · DISTRICT 10

L S Ranch #2

Y

Oldham County · Cat Scratch(cisco Sand) field · Producing  · Vertical

L S Ranch #2 (API 42-359-30312) is a well in Oldham County operated by Sunlight Exploration Inc., completed June 4, 2025 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2008 and 2025, permitted to 9,900 ft.

Completion filings report 9 formation tops, including T/Red Cave, T/White Dolomite, White Dolomite, Cisco.

Its 2 leases have reported 59.6K barrels of oil and 3.16K mcf of gas since February 2008, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Sunlight Exploration Inc.

Canyon, TX · P-5 Y, filed May 4, 2026 · 50 permits on file · (806) 674-4140

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSunlight Exploration Inc.
Production reportsSunlight Exploration, Inc.through Apr 2026
Latest permitSunlight Exploration, Inc.Jul 30, 2025
9,900
total depth, ft
2
permits on file
Jul 30, 2025
last permit issued
Jun 4, 2025
completed
59.6K
cumulative oil, bbl
3.16K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 4, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

35.472760, -102.241641

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Oldham County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
L S Ranch O-14-7879Cat Scratch (Granite Wash)Sunlight Exploration, Inc.240.6K0Feb 2008 – Jul 2026
L S Ranch O-14-9875Cat Scratch(cisco Sand)Sunlight Exploration, Inc.219K3.16KJun 2025 – Jul 2026

Oil, barrels lease total

Last 12 months 19,044 · prior 12 1,033(+1744%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 3,162 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gunn Oil CompanyFeb 2008 → Feb 2011
  2. 2Sunlight Exploration, Inc.Jul 2012 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
909561-99RecompletionSunlight Exploration, Inc.Jul 30, 2025Jul 30, 2025—9,125
659241-99DrillGunn Oil CompanyApr 9, 2008Apr 23, 2008Apr 24, 20089,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-7879————
—— O-14-9875————

Formation tops

As filed on W-2/G-1. Subsea from 3,637 ft elevation.Download CSV →

FormationMD ftSubsea
T/Red Cave3,100537
T/White Dolomite4,754-1,117
White Dolomite4,754-1,117
CiscoCISCO SAND7,345-3,708
T/Cisco Sand7,346-3,709
Canyon8,687-5,050
T/Canyon8,687-5,050
Strawn9,003-5,366
T/Strawn9,003-5,366

Perforations

Perforated and open-hole intervals.

FromToType
7,3467,374Perforated
8,9488,962Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37552717.5600 S
9.6254,09512.25300 S
5.59,1258.75600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 24, 2026Mar 15, 2026—
00Sep 15, 2025Aug 4, 2025—
00Dec 2, 2008Sep 25, 2008Yes
00Nov 5, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

L S Ranch42-359-30310

0.9 KM · Sunlight Exploration, Inc. · Section with this well →

Brown Dolomite4,489-1,119
T/Brown Dol.4,489-1,119
T/Wolfcamp5,734-2,364
Wolfcamp5,734-2,364
T/Cisco7,010-3,640
Cisco7,010-3,640
T/Canyon8,602-5,232
Canyon8,602-5,232

11 TOPS · FIRST 8

High Noon42-375-31884

7.9 KM · Valpoint Operating, LLC · Section with this well →

Red Cave3,000294
Brown Dolomite4,350-1,056
Wolfcamp6,050-2,756
Pennsylvanian8,200-4,906
Pennsylvanian8,400-5,106
Canyon9,000-5,706
Granite Wash—
Ellenburger—

9 TOPS · FIRST 8

Black Stone42-375-31888

8.1 KM · LE Norman Operating LLC · Section with this well →

Red Cave3,150204
Brown Dolomite4,516-1,162
Wolfcamp8,562-5,208
Canyon9,030-5,676
Granite Wash—
Ellenburger—
Pennsylvanian—
Cliffside—

9 TOPS · FIRST 8

Black Stone42-375-31886

8.1 KM · LE Norman Operating LLC · Section with this well →

Red Cave3,150206
Brown Dolomite4,516-1,160
Wolfcamp6,562-3,206
Canyon9,030-5,674
Pennsylvanian—
Pennsylvanian—
Granite Wash—
Ellenburger—

9 TOPS · FIRST 8

Bivins-Lit42-359-30367

8.4 KM · Apache Corporation · Section with this well →

Cisco7,560-4,199
Ert Sand8,645-5,284
Washoout Shale8,797-5,436
Washout Shale8,797-5,436
Canyon9,007-5,646
Canyon9,216-5,855

Lair Ranch 5842-375-31821

9.6 KM · LE Norman Operating LLC · Section with this well →

Red Cave2,997177
Brown Dolomite4,396-1,222
Wolfcamp6,440-3,266
Canyon8,893-5,719
Ellenburger—
Cliffside—
Granite Wash—
Pennsylvanian—

9 TOPS · FIRST 8

Bivins-Lit42-359-30414

9.7 KM · Apache Corporation · Section with this well →

Wolfcamp5,762-2,415
Wolfcamp7,514-4,167
Cisco7,640-4,293
Ert8,505-5,158
Washout Shale8,670-5,323
Paint Ridge (Canyon Granite WSH)9,035-5,688
Rico Creek (Strawn Granite Wash)9,466-6,119
Binford—

17 TOPS · FIRST 8

Bivins-Lit42-359-30359

9.9 KM · Apache Corporation · Section with this well →

Panhandle Lime3,636-331
Brown Dolomite4,279-974
Canyon9,035-5,730
Canyon9,296-5,991
Strawn9,607-6,302
Red Cave—

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35930312, documented in the API reference.