TEXAS · WELLS · PALO PINTO COUNTY · API 42-363-31048 · DISTRICT 6E

Pittman H. T. #1

Plugged

Palo Pinto County · Palo Pinto Co. Reg. (Gas) field  · Vertical

Pittman H. T. #1 (API 42-363-31048) is a plugged well in Palo Pinto County, plugged August 29, 1988, last operated by Rampart Petroleum Incorporated.

The RRC has issued one drilling permit, issued July 28, 1977, permitted to 3,270 ft.

It was permitted by Childers, Charles M. and has since transferred to Rampart Petroleum Incorporated on the wellbore schedule.

Operator of record

Rampart Petroleum Incorporated

Permitted by Childers, Charles M.; the EWA schedule now lists a different operator.

Based in
Buffalo Gap, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 8, 2011
Permits on file
43
Phone
(214) 543-1153

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRampart Petroleum Incorporated
Production reportsnone
Latest permitChilders, Charles M.Jul 28, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,270
total depth, ft
1
permits on file
Jul 28, 1977
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Aug 29, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
4181-99DrillChilders, Charles M.Jul 28, 1977Jul 28, 1977—3,270

Completions

CompletedLeaseFieldOperatorStatusDepth
—Pittman H. T. G-8-72390Palo Pinto Co. Reg. (Gas)Rampart Petroleum IncorporatedPlugged—

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62525010.25115 S
4.53,3227.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Aug 4, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36331048, documented in the API reference.