TEXAS · WELLS · PALO PINTO COUNTY · BARNETT, R. S. LEASE · API 42-363-31227 · DISTRICT 6E

Barnett R. S. #1

Shut in

Palo Pinto County · Graford (Bend Conglomerate) field · Temp Abandoned  · Vertical

Barnett R. S. #1 (API 42-363-31227) is a well in Palo Pinto County operated by Global Drilling LLC, completed August 12, 1977 and listed as temp abandoned on the RRC schedule, shut in May 1, 2025.

The RRC has issued 2 drilling permits between 1978 and 1979, permitted to 4,808 ft.

It was permitted by Taylor Oper. CO. and has since transferred to Global Drilling LLC on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Global Drilling LLC

Permitted by Taylor Oper. Co.; the EWA schedule now lists a different operator.

Based in
N Richlnd HLS, TX
P-5 status
Delinquent (D)
P-5 last filed
Apr 23, 2025
Permits on file
5
Phone
(940) 549-0131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsGlobal Drilling, LLCthrough Apr 2025
Latest permitTaylor Oper. Co.Feb 15, 1979
4,808
total depth, ft
2
permits on file
Feb 15, 1979
last permit issued
Aug 12, 1977
completed
0
cumulative oil, bbl
102K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 12, 1977
Shut in
May 1, 2025
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barnett, R. S. G-8-74212Graford (Bend Conglomerate)Global Drilling, LLC10102KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 205(-100%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1S & J Operating Co.Jan 1993 → Aug 1993
  2. 2Stephens & Johnson Operating Co.Sep 1993 → Aug 1995
  3. 3Dimock Operating CompanySep 1995 → Mar 1997
  4. 4Cox, Lee Investments Inc.Apr 1997 → May 2023
  5. 5Global Drilling, LLCJun 2023 → Apr 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
43575-99RecompletionTaylor Oper. Co.Feb 15, 1979Feb 15, 1979—4,800
21318-99OtherTaylor Oper. Co.Apr 4, 1978Apr 4, 1978Nov 10, 19784,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 12, 1977Barnett R. S. G-8-74212Graford (Bend Conglomerate)Global Drilling LLCTemp Abandoned · shut in May 1, 20254,808

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62537012.25245 S
4.54,8087.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Dec 5, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36331227, documented in the API reference.