TEXAS · WELLS · PALO PINTO COUNTY · CANTEY ESTATE LEASE · API 42-363-32290 · DISTRICT 6E
Cantey Estate #1
Palo Pinto County · Belding (Bend Congl.) field · Vertical
Cantey Estate #1 (API 42-363-32290) is a plugged well in Palo Pinto County, plugged November 18, 2002, last operated by Echo Production Inc..
The RRC has issued 2 drilling permits between 1979 and 1981, permitted to 4,000 ft.
It was permitted by Santa Rosa Oil Company and has since transferred to Echo Production Inc. on the wellbore schedule.
Operator of record
Permitted by Santa Rosa Oil Company; the EWA schedule now lists a different operator.
- Based in
- Graham, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Mar 5, 2025
- Permits on file
- 296
- Phone
- (940) 549-3292
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Echo Production Inc. |
| Production reports | none |
| Latest permit | Santa Rosa Oil CompanyMar 17, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 2
- permits on file
- Mar 17, 1981
- last permit issued
- Jul 28, 1980
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 28, 1980
- Shut in
- —
- Plugged
- Nov 18, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cantey Estate O-8-16271 | Belding (Bend Congl.) | Echo Production, Inc. | 1 | 0 | 0 | Jan 1993 – Dec 2002 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 116444-99 | Recompletion | Santa Rosa Oil Company | Mar 17, 1981 | Mar 17, 1981 | — | 4,000 |
| 68411-99 | Drill | Santa Rosa Oil Company | Dec 31, 1979 | Dec 31, 1979 | Feb 6, 1980 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 28, 1980 | Cantey Estate O-8-16271 | Belding (Bend Congl.) | Echo Production Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,989 | 3,991 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 213 | 12.25 | 150 S |
| 2.375 | 3,985 | — | — |
| 4.5 | 4,043 | 7.875 | 285 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 14, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-32290 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-32290 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000092362 | H-1 Injection | Plugged Dec 18, 2002 | 100 | 200 | 3,989–3,991 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36332290, documented in the API reference.