TEXAS · WELLS · PALO PINTO COUNTY · G-8-128741 LEASE · API 42-363-32500 · DISTRICT 6E

Magers-Bates #1

Plugged

Palo Pinto County · Magers (Congl. Upper) field  · Vertical

Magers-Bates #1 (API 42-363-32500) is a plugged well in Palo Pinto County, plugged December 26, 1989, last operated by Pitcock Inc..

The RRC has issued one drilling permit, issued November 10, 1980, permitted to 4,300 ft.

Completion filings report 3 formation tops, including Palo Pinto, Pregnant Shale, Marble Falls.

Operator of record

Pitcock Inc.

Based in
Graham, TX
P-5 status
Active (A)
P-5 last filed
Jul 21, 2025
Permits on file
265
Phone
(940) 549-3344

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePitcock Inc.
Production reportsnone
Latest permitPitcock, Inc.Nov 10, 1980
4,300
total depth, ft
1
permits on file
Nov 10, 1980
last permit issued
Dec 26, 1980
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 26, 1980
Shut in
—
Plugged
Dec 26, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-8-128741——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
98523-99DrillPitcock, Inc.Nov 10, 1980Nov 10, 1980Nov 24, 19804,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 26, 1980Magers-Bates O-8-16713Magers (Congl. Upper)Pitcock Inc.Plugged—
Dec 26, 1980Magers-Bates G-8-128741Magers (Congl. Upper)Pitcock Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 785 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LIME1,765-980
Pregnant Shale2,888-2,103
Marble FallsMARBLE FALLS LIME4,145-3,360

Perforations

Perforated and open-hole intervals.

FromToType
3,8023,806Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516012.25125 S
2.3753,707——
4.53,9007.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 20, 1988Oct 27, 1988—
00Nov 23, 1988——
00Jan 12, 1984Jan 8, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36332500, documented in the API reference.