TEXAS · WELLS · PALO PINTO COUNTY · API 42-363-32960 · DISTRICT 6E
Wright et Al #1
Palo Pinto County · Mineral Wells (Strawn Upper) field · Vertical
Wright ET AL #1 (API 42-363-32960) is a plugged well in Palo Pinto County, plugged June 20, 1985, last operated by Hexagon Oil And Gas Inc..
The RRC has issued one drilling permit, issued August 11, 1982, permitted to 4,650 ft.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 16, 2026
- Permits on file
- 221
- Phone
- (817) 263-3500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hexagon Oil and Gas Inc. |
| Production reports | none |
| Latest permit | Hexagon Oil and Gas Inc.Aug 11, 1982 |
- 4,650
- total depth, ft
- 1
- permits on file
- Aug 11, 1982
- last permit issued
- Oct 10, 1982
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 10, 1982
- Shut in
- —
- Plugged
- Jun 20, 1985
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Wells named Wright et Al
Hexagon Oil and Gas Inc.'s other wells filed under this lease name in Palo Pinto County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsPermits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 168970-99 | Drill | Hexagon Oil and Gas Inc. | Aug 11, 1982 | Aug 11, 1982 | — | 4,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 10, 1982 | Wright et Al G-8-102896 | Mineral Wells (Strawn Upper) | Hexagon Oil and Gas Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,535 | 2,641 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 567 | 12.25 | 375 S |
| 2.375 | 2,435 | — | — |
| 4.5 | 4,285 | 7.875 | 495 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Nov 22, 1982 | Yes |
Well logs
2 logs loaded from the RRC's log index, the latest received Nov 6, 2006. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| Neutron/Density PorosityCOMPENSATED DENSITY COMPENSATED NEUTRON | TIFF | 750 to 4,651 | Nov 6, 2006run Aug 21, 1982 | — |
| ResistivityDUAL INDUCTION LATEROLOG | TIFF | 565 to 4,654 | Nov 6, 2006run Aug 12, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-32960 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-32960 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36332960, documented in the API reference.