WELL · 42-363-33045 · DISTRICT 7
Cantey Estate A #1
Palo Pinto County · Set Ranch (Congl) field · Vertical
Cantey Estate A #1 (API 42-363-33045) is a plugged well in Palo Pinto County, plugged October 12, 2005, last operated by Dallas Production Inc..
The RRC has issued 2 drilling permits between 1982 and 1985, permitted to 3,907 ft.
Completion filings report 2 formation tops, including Big Saline, Marble Falls.
Its lease has reported 5.07K barrels of oil and 150K mcf of gas since January 1993, last reporting in January 2006.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 11, 2020
- Permits on file
- 823
- Phone
- (214) 369-9266
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dallas Production Inc. |
| Production reports | Dallas Production, Inc.through Nov 2004 |
| Latest permit | Dallas Production, Inc.Aug 23, 1985 |
- 3,907
- total depth, ft
- 2
- permits on file
- Aug 23, 1985
- last permit issued
- Jul 29, 1985
- completed
- 5.07K
- cumulative oil, bbl
- 150K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 29, 1985
- Shut in
- —
- Plugged
- Oct 12, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cantey Estate "A" O-8-22913 | Set Ranch (Congl) | Dallas Production, Inc. | 1 | 5.07K | 150K | Jan 1993 – Jan 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dallas Production, Inc.Jan 1993 → May 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 283202-99 | Recompletion | Dallas Production, Inc. | Aug 23, 1985 | Aug 23, 1985 | — | 3,907 |
| 180391-99 | Drill | Dallas Production, Inc. | Dec 16, 1982 | Dec 16, 1982 | — | 3,907 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-22913 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 985 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Big Saline | 3,370 | -2,385 |
| Marble Falls | 3,882 | -2,897 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,373 | 3,377 | Perforated |
| 3,380 | 3,384 | Perforated |
| 3,412 | 3,422 | Perforated |
| 3,424 | 3,426 | Perforated |
| 3,797 | 3,805 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 243 | 12.25 | 195 S |
| 2.375 | 3,784 | — | — |
| 4.5 | 3,907 | 7.875 | 220 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 25, 1986 | Aug 26, 1985 | — |
| 00 | Sep 17, 1985 | — | — |
| 00 | Jan 12, 1984 | May 16, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-33045 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-33045 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36333045, documented in the API reference.