WELL · 42-363-33410 · DISTRICT 7
Warren #1
Palo Pinto County · Mineral Wells (Conglomerate) field · Producing · Vertical
Warren #1 (API 42-363-33410) is a well in Palo Pinto County operated by 4w Operating LLC, completed October 12, 1984 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued August 31, 1984, permitted to 4,500 ft.
It was permitted by Txo Production Corp. and has since transferred to 4w Operating LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Canyon, Pregnant Shale.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.
Breckenridge, TX · P-5 Y, filed May 4, 2026 · (254) 246-2835
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | 4W Operating LLC |
| Production reports | 4W Operating, LLCthrough Apr 2026 |
| Latest permit | TXO Production Corp.Aug 31, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 1
- permits on file
- Aug 31, 1984
- last permit issued
- Oct 12, 1984
- completed
- 0
- cumulative oil, bbl
- 684K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 12, 1984
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Warren G-8-114533 | Mineral Wells (Conglomerate) | 4W Operating, LLC | 1 | 0 | 684K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 10,542 · prior 12 10,057(+5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Karper Company, TheJan 1993 → Feb 2003
- 2Karper Oil & Gas CorporationMar 2003 → Feb 2023
- 34W Operating, LLCMar 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 250331-99 | Drill | TXO Production Corp. | Nov 26, 1984 | Aug 31, 1984 | — | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-114533 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,062 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CanyonCANYON SAND | 1,315 | -253 |
| Pregnant Shale | 3,360 | -2,298 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,420 | 4,424 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 561 | 12.25 | 345 S |
| 4.5 | 4,497 | 7.875 | 185 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 11, 1985 | Nov 26, 1984 | — |
| 00 | Feb 9, 1985 | Oct 15, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-33410 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-33410 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36333410, documented in the API reference.