WELL · 42-363-33469 · DISTRICT 7
Carter G #1
Palo Pinto County · Nan-O (4000 Congl) field · Vertical
Carter G #1 (API 42-363-33469) is a well in Palo Pinto County operated by Txo Production Corp., completed December 10, 1984.
The RRC has issued 2 drilling permits between 1984 and 1987, permitted to 4,900 ft.
Completion filings report 2 formation tops, including Pregnant Shale, Ellenburger.
Its lease has reported 2.09K barrels of oil and 157K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 2, 1990
- Permits on file
- 3,227
- Phone
- (214) 954-2086
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TXO Production Corp. |
| Production reports | Arrowhead Productions, LPthrough Jun 2016 |
| Latest permit | TXO Production Corp.Jul 7, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,900
- total depth, ft
- 2
- permits on file
- Jul 7, 1987
- last permit issued
- Dec 10, 1984
- completed
- 2.09K
- cumulative oil, bbl
- 157K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 10, 1984
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carter "G" O-8-24430 | Metcalf Gap, E. (Congl. 3500) | Arrowhead Productions, LP | 1 | 2.09K | 157K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Baggett Exploration Co.Jan 1993 → Jan 1994
- 2Borderline Operating Corp.Jul 2001 → Dec 2001
- 3Moore, Stephen OperatingJan 2002 → Jun 2002
- 4Raylee Operating CompanyJul 2002 → Dec 2011
- 5Arrowhead Productions, LPJan 2012 → Jun 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 332588-99 | Recompletion | TXO Production Corp. | Jul 7, 1987 | Jul 7, 1987 | — | 4,500 |
| 257955-99 | Drill | TXO Production Corp. | Nov 15, 1984 | Nov 15, 1984 | — | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24430 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,143 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pregnant Shale | 3,200 | -2,057 |
| Ellenburger | 4,400 | -3,257 |
| Ellenburger | 4,440 | -3,297 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,546 | 3,569 | Perforated |
| 3,574 | 3,577 | Perforated |
| 3,611 | 3,614 | Perforated |
| 3,948 | 3,952 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 277 | 12.25 | 160 S |
| 4.5 | 4,106 | 7.875 | 260 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 18, 1988 | Jul 18, 1988 | — |
| 00 | Aug 6, 1987 | Jul 17, 1987 | Yes |
| 00 | Jul 25, 1987 | — | — |
| 00 | Feb 20, 1985 | Jan 29, 1985 | — |
| 00 | Feb 16, 1985 | Jan 7, 1985 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-33469 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-33469 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36333469, documented in the API reference.