TEXAS · WELLS · PALO PINTO COUNTY · LONG RANCH LEASE · API 42-363-33725 · DISTRICT 6E

Long Ranch #6

Shut in

Palo Pinto County · Long Ranch (Bend Congl.) field · Temp Abandoned  · Vertical

Long Ranch #6 (API 42-363-33725) is a well in Palo Pinto County operated by Stephens & Johnson Operating CO., completed June 4, 1986 and listed as temp abandoned on the RRC schedule, shut in April 1, 2022.

The RRC has issued one drilling permit, issued April 17, 1986, permitted to 3,730 ft.

It was permitted by Sun Expl. & Prod. CO.-Abilene and has since transferred to Stephens & Johnson Operating CO. on the wellbore schedule.

Completion filings report one formation top, including Marble Falls.

Its lease has reported 537 barrels of oil and 112K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Stephens & Johnson Operating Co.

Permitted by Sun Expl. & Prod. Co.-Abilene; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Mar 2022
Latest permitSun Expl. & Prod. Co.-AbileneApr 17, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,730
total depth, ft
1
permits on file
Apr 17, 1986
last permit issued
Jun 4, 1986
completed
537
cumulative oil, bbl
112K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2022

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 4, 1986
Shut in
Apr 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Long Ranch G-8-121378Long Ranch (Bend Congl.)Stephens & Johnson Operating Co.1537112KJan 1993 – Mar 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shaida, John H.Jan 1993 → Jun 2001
  2. 2Stephens & Johnson Operating Co.Jul 2001 → Mar 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
301196-99DrillSun Expl. & Prod. Co.-AbileneApr 17, 1986Apr 17, 1986Apr 23, 19864,050

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 4, 1986Long Ranch G-8-121378Long Ranch (Bend Congl.)Stephens & Johnson Operating Co.Temp Abandoned · shut in Apr 1, 20223,730

Formation tops

As filed on W-2/G-1. Subsea from 1,033 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls3,475-2,442

Perforations

Perforated and open-hole intervals.

FromToType
3,3063,312Perforated
3,3603,370Perforated
3,4703,475Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62536012.25275 S
5.53,7307.875650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 26, 1986Jun 20, 1986Yes
00Jun 25, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36333725, documented in the API reference.