TEXAS · WELLS · PALO PINTO COUNTY · SET RANCH LEASE · API 42-363-33774 · DISTRICT 6E

Set Ranch #40

Shut in

Palo Pinto County · Set Ranch (Congl) field · Temp Abandoned  · Vertical

Set Ranch #40 (API 42-363-33774) is a well in Palo Pinto County operated by Dallas Production Company LLC, completed January 13, 1987 and listed as temp abandoned on the RRC schedule, shut in November 1, 2019.

The RRC has issued one drilling permit, issued October 31, 1986, permitted to 4,190 ft.

It was permitted by Dallas Production, Inc. and has since transferred to Dallas Production Company LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Preg. Shale, Big Saline, Marble Falls.

No lease production has been reported under this well’s leases.

Operator of record

Dallas Production Company LLC

Permitted by Dallas Production, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Feb 12, 2026
Permits on file
28
Phone
(214) 265-4300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDallas Production Company LLC
Production reportsDallas Production, Inc.through Oct 2019
Latest permitDallas Production, Inc.Oct 31, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,190
total depth, ft
1
permits on file
Oct 31, 1986
last permit issued
Jan 13, 1987
completed
0
cumulative oil, bbl
197K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 13, 1987
Shut in
Nov 1, 2019
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Set Ranch G-8-123188Set Ranch (Congl)Dallas Production Company LLC10197KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dallas Production, Inc.Jan 1993 → Oct 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
322599-99DrillDallas Production, Inc.Oct 31, 1986Oct 31, 1986—4,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 13, 1987Set Ranch G-8-123188Set Ranch (Congl)Dallas Production Company LLCTemp Abandoned · shut in Nov 1, 20194,190

Formation tops

As filed on W-2/G-1. Subsea from 1,198 ft elevation.Download CSV →

FormationMD ftSubsea
Preg. Shale3,620-2,422
Big Saline3,763-2,565
Marble Falls4,130-2,932

Perforations

Perforated and open-hole intervals.

FromToType
4,0384,048Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521212.25160 S
4.54,1707.875140 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 12, 1987Jan 29, 1987Yes
00Feb 10, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000124749H-1 InjectionNot activated1001,5004,038–4,048

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36333774, documented in the API reference.