TEXAS · WELLS · PALO PINTO COUNTY · LANDAR LEASE · API 42-363-34127 · DISTRICT 6E

Landar #16

Plugged

Palo Pinto County · Palm (Caddo) field  · Vertical

Landar #16 (API 42-363-34127) is a plugged well in Palo Pinto County, plugged January 18, 1994, last operated by Smith Pipe Of Abilene.

The RRC has issued one drilling permit, issued April 3, 1992, permitted to 4,500 ft.

It was permitted by Primrose Operating Company and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Operator of record

Smith Pipe of Abilene

Permitted by Primrose Operating Company; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 29, 2014
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Pipe of Abilene
Production reportsnone
Latest permitPrimrose Operating CompanyApr 3, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
1
permits on file
Apr 3, 1992
last permit issued
May 20, 1992
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 20, 1992
Shut in
—
Plugged
Jan 18, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Landar G-8-141851Palm (Caddo)Smith Pipe of Abilene100Jan 1993 – Jan 1994

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
397739-99DrillPrimrose Operating CompanyMar 24, 1992Apr 3, 1992Mar 29, 19924,500

Completions

CompletedLeaseFieldOperatorStatusDepth
May 20, 1992Landar G-8-141851Palm (Caddo)Smith Pipe of AbilenePlugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,7423,754Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515212.25100 S
4.54,0557.875160 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 1992Jun 12, 1992Yes
00Aug 6, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104631W-14 DisposalCanceled Jan 21, 20207509701,940–2,170

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334127, documented in the API reference.