TEXAS · WELLS · PALO PINTO COUNTY · API 42-363-34199 · DISTRICT 6E

Stuart Estate 49 #2

Plugged

Palo Pinto County · Strawn NW. (Conglomerate) field  · Vertical

Stuart Estate 49 #2 (API 42-363-34199) is a plugged well in Palo Pinto County, plugged September 16, 1998, last operated by Borderline Operating Corp..

The RRC has issued 2 drilling permits between 1993 and 1995, permitted to 4,300 ft.

It was permitted by Cumming Company, Inc. The and has since transferred to Borderline Operating Corp. on the wellbore schedule.

Completion filings report 5 formation tops, including Strawn, Caddo, Big Saline, Conglomerate.

Its 2 leases have reported 123K barrels of oil and 1.07M mcf of gas since August 1993, last reporting in August 2017. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Borderline Operating Corp.

Permitted by Cumming Company, Inc. The; the EWA schedule now lists a different operator.

Based in
Graham, TX
P-5 status
Active (A)
P-5 last filed
Mar 17, 2026
Permits on file
98
Phone
(940) 549-1014

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBorderline Operating Corp.
Production reportsCumming Company, Inc. Thethrough Oct 2008
Latest permitCumming Company, Inc. TheMay 4, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,300
total depth, ft
2
permits on file
May 4, 1995
last permit issued
Aug 9, 1993
completed
123K
cumulative oil, bbl
1.07M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1993 THROUGH Aug 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 9, 1993
Shut in
—
Plugged
Sep 16, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stuart Estate "49" O-8-27076Strawn, NW. (Conglomerate)Borderline Operating Corp.4123K808KSep 1993 – Aug 2017
Stuart Estate "49" G-8-146257Cumming (Conglomerate)Cumming Company, Inc. The10265KAug 1993 – Apr 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cumming Company, Inc. TheAug 1993 → Oct 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
435513-99Field transferCumming Company, Inc. TheMay 4, 1995May 4, 1995Jul 28, 19934,000
414294-99DrillCumming Company, Inc. TheJul 27, 1993Jul 28, 1993Jul 28, 19934,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 9, 1993Stuart Estate 49 O-8-27076Strawn NW. (Conglomerate)Borderline Operating Corp.Plugged—
Aug 9, 1993Stuart Estate 49 G-8-146257Cumming (Conglomerate)Cumming Company Inc. ThePlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,335 ft elevation.Download CSV →

FormationMD ftSubsea
StrawnUPPER STRAWN1,196139
StrawnLOWER STRAWN1,720-385
Caddo3,130-1,795
Big Saline3,500-2,165
Conglomerate3,700-2,365
Marble Falls3,970-2,635

Perforations

Perforated and open-hole intervals.

FromToType
3,7503,755Perforated
3,7703,774Perforated
3,7843,789Perforated
3,7953,810Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62525012.25155 S
4.53,9887.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 14, 1995May 9, 1995Yes
00May 30, 1995——
00Oct 21, 1993Aug 23, 1993Yes
00Sep 2, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334199, documented in the API reference.