TEXAS · WELLS · PALO PINTO COUNTY · GIBSON LEASE · API 42-363-34346 · DISTRICT 6E

Gibson #1

Y

Palo Pinto County · B.R.A. (Congl.) field · Producing  · Vertical

Gibson #1 (API 42-363-34346) is a well in Palo Pinto County operated by Texxol Operating Company Inc., completed February 18, 1995 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued December 21, 1994, permitted to 4,130 ft.

It was permitted by Talon Production, Inc. and has since transferred to Texxol Operating Company Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Strawn, Conglomerate, Marble Falls.

Its lease has reported 3.85K barrels of oil and 661K mcf of gas since February 1995, last reporting volume in April 2026.

Operator of record

Texxol Operating Company Inc.

Permitted by Talon Production, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
May 19, 2026
Permits on file
20
Phone
(817) 246-2455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexxol Operating Company Inc.
Production reportsTexxol Operating Company, Inc.through Apr 2026
Latest permitTalon Production, Inc.Dec 21, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,130
total depth, ft
2
permits on file
Dec 21, 1994
last permit issued
Feb 18, 1995
completed
3.85K
cumulative oil, bbl
661K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1995 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 18, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gibson G-8-153378B.R.A. (Congl.)Texxol Operating Company, Inc.13.85K661KFeb 1995 – Apr 2026

Gas, mcf lease total

Last 12 months 5,991 · prior 12 6,880(-13%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Talon Production, Inc.Feb 1995 → Nov 2001
  2. 2Sitton, Ronnie IncorporatedDec 2001 → Feb 2003
  3. 3Richey, Ray Management Co., Inc.Mar 2003 → Jul 2013
  4. 4Texxol Operating Company, Inc.Aug 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
431097-98DrillTalon Production, Inc.Feb 23, 1995Dec 21, 1994Jan 11, 19954,300
431097-99DrillTalon Production, Inc.Dec 19, 1994Dec 21, 1994—4,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 18, 1995Gibson G-8-153378B.R.A. (Congl.)Texxol Operating Company Inc.Producing4,130

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Strawn2,730
Conglomerate3,988
Marble Falls4,096

Perforations

Perforated and open-hole intervals.

FromToType
3,9893,998Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520712.25140 S
4.54,1267.875145 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 21, 1995Mar 3, 1995Yes
00Mar 29, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334346, documented in the API reference.