WELL · 42-363-34453 · DISTRICT 7
Stuart Ranch #6101
Palo Pinto County · Iona Hickey (Conglomerate) field · Vertical
Stuart Ranch #6101 (API 42-363-34453) is a plugged well in Palo Pinto County, plugged September 29, 2015, last operated by Tarpon Oil & Gas CO..
The RRC has issued one drilling permit, issued August 16, 1996, permitted to 4,500 ft.
It was permitted by Tarpon Oil Company and has since transferred to Tarpon Oil & Gas CO. on the wellbore schedule.
Completion filings report 3 formation tops, including Strawn, Big Saline, Marble Falls.
Operator of record
Permitted by Tarpon Oil Company; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 14, 2025
- Permits on file
- 67
- Phone
- (817) 332-5255
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tarpon Oil & Gas Co. |
| Production reports | Tarpon Oil Companythrough Apr 1999 |
| Latest permit | Tarpon Oil CompanyAug 16, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 1
- permits on file
- Aug 16, 1996
- last permit issued
- Oct 16, 1995
- completed
- 0
- cumulative oil, bbl
- 219K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Sep 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 16, 1995
- Shut in
- —
- Plugged
- Sep 29, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stuart Ranch G-8-156215 | Iona Hickey (Conglomerate) | Tarpon Oil & Gas Co. | 1 | 0 | 219K | Oct 1995 – Sep 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tarpon Oil CompanyOct 1995 → Apr 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 438775-99 | Drill | Tarpon Oil Company | Aug 11, 1995 | Aug 16, 1996 | Sep 13, 1995 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-156215 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,229 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| StrawnSTRAWN TOP | 1,500 | -271 |
| Big SalineBIG SALINE TOP | 3,433 | -2,204 |
| Marble FallsMARBLE FALLS LM | 3,950 | -2,721 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,648 | 3,656 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 283 | 12.25 | 140 S |
| 4.5 | 3,800 | 7.875 | 130 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 11, 1996 | Nov 6, 1995 | Yes |
| 00 | Dec 12, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-34453 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-34453 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36334453, documented in the API reference.