TEXAS · WELLS · PALO PINTO COUNTY · LONG RANCH LEASE · API 42-363-34462 · DISTRICT 6E
Long Ranch #12
Palo Pinto County · Burleson (Strawn) field · Vertical
Long Ranch #12 (API 42-363-34462) is a plugged well in Palo Pinto County, plugged September 19, 2011, last operated by Stephens & Johnson Operating CO..
The RRC has issued one drilling permit, issued August 30, 1995, permitted to 4,000 ft.
Completion filings report 4 formation tops, including Strawn, Caddo, Big Saline, Duffer.
Operator of record
Stephens & Johnson Operating Co.
- Based in
- Wichita Falls, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jul 2, 2026
- Permits on file
- 360
- Phone
- (940) 723-2166
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stephens & Johnson Operating Co. |
| Production reports | Stephens & Johnson Operating Co.through Aug 1999 |
| Latest permit | Stephens & Johnson Operating Co.Aug 30, 1995 |
- 4,000
- total depth, ft
- 1
- permits on file
- Aug 30, 1995
- last permit issued
- Nov 25, 1995
- completed
- 0
- cumulative oil, bbl
- 39.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1995 THROUGH Sep 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 25, 1995
- Shut in
- —
- Plugged
- Sep 19, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Long Ranch G-8-156687 | Burleson (Strawn) | Stephens & Johnson Operating Co. | 1 | 0 | 39.9K | Nov 1995 – Sep 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stephens & Johnson Operating Co.Nov 1995 → Aug 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 439384-99 | Drill | Stephens & Johnson Operating Co. | Aug 28, 1995 | Aug 30, 1995 | Oct 10, 1995 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 25, 1995 | Long Ranch G-8-156687 | Burleson (Strawn) | Stephens & Johnson Operating Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 981 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| StrawnSTRAWN SANDS | 1,790 | -809 |
| CaddoCADDO SANDS | 2,395 | -1,414 |
| Big SalineBIG SALINE NO. 1 CONGL. | 3,090 | -2,109 |
| Big SalineBIG SALINE NO. 3 CONGL. | 3,180 | -2,199 |
| DufferDUFFER LIME | 3,576 | -2,595 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,744 | 1,760 | Perforated |
| 1,825 | 1,831 | Perforated |
| 1,864 | 1,875 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 314 | 11 | 125 S |
| 4.5 | 3,555 | 7.875 | 405 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 4, 1996 | Dec 21, 1995 | Yes |
| 00 | Jan 29, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-34462 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-34462 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36334462, documented in the API reference.