TEXAS · WELLS · PALO PINTO COUNTY · STUART, ELLEN G. "B" LEASE · API 42-363-34471 · DISTRICT 6E

Stuart Ellen G. B #4

Y

Palo Pinto County · Lonesome Duffer (Duffer) field · Producing  · Vertical

Stuart Ellen G. B #4 (API 42-363-34471) is a well in Palo Pinto County operated by Stephens & Johnson Operating CO., completed October 30, 1995 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1995 and 1996, permitted to 4,052 ft.

Completion filings report 8 formation tops, including Cross Cut, 1550 Strawn, 1550' Strawn, Caddo.

Its lease has reported 1.24K barrels of oil and 1.03M mcf of gas since October 1995, last reporting volume in April 2026.

Operator of record

Stephens & Johnson Operating Co.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitStephens & Johnson Operating Co.May 24, 1996
4,052
total depth, ft
2
permits on file
May 24, 1996
last permit issued
Oct 30, 1995
completed
1.24K
cumulative oil, bbl
1.03M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1995 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 30, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stuart, Ellen G. "B" G-8-155952Lonesome Duffer (Duffer)Stephens & Johnson Operating Co.11.24K1.03MOct 1995 – Apr 2026

Gas, mcf lease total

Last 12 months 7,215 · prior 12 8,876(-19%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stephens & Johnson Operating Co.Nov 1995 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
448535-99Field transferStephens & Johnson Operating Co.May 24, 1996May 24, 1996Oct 17, 19954,050
440374-99DrillStephens & Johnson Operating Co.Sep 28, 1995Sep 28, 1995Oct 17, 19956,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 30, 1995Stuart Ellen G. B G-8-155952Lonesome Duffer (Duffer)Stephens & Johnson Operating Co.Producing4,052
Oct 30, 1995Stuart Ellen G. B G-8-155952Lonesome Duffer (Duffer)Stephens & Johnson Operating Co.Producing4,052

Formation tops

As filed on W-2/G-1. Subsea from 1,427 ft elevation.Download CSV →

FormationMD ftSubsea
Cross Cut550877
1550 Strawn1,577-150
1550' Strawn1,577-150
CaddoCADDO SAND2,290-863
BS Congl NO 13,477-2,050
BS Congl. No. 13,477-2,050
BS Congl NO 63,942-2,515
BS Congl. No. 63,942-2,515

Perforations

Perforated and open-hole intervals.

FromToType
3,9804,052Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62548711200 S
5.53,9807.875115 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 21, 1996Jun 4, 1996Yes
00Jan 11, 1996Nov 10, 1995Yes
00Nov 27, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334471, documented in the API reference.